Laserfiche WebLink
<br />FORECAST <br />According to the April15, 2005 mid-month forecast, the March 2005 inflow to Upper Basin Reservoirs ranged from 89% to <br />125% of average. <br /> <br />Table 3. Forecast and inflow comparisons of the Upper Colorado River Basin Reservoirs <br /> <br /> Mar 05 Inflow PERCENT Apr-Jul 05 PERCENT <br /> (1000 a.f.) OF AVERAGE inflo forcast OF AVERAGE <br />Lake Powell 594 89% 8400 106% <br />Flaming Gorge 122 125% 1050 88% <br />Blue Mesa 29 81% 770 107% <br />Fontenelle 65 125% 730 85% <br />Navajo 89 100% 1270 159% <br /> <br />POWER GENERATION <br /> <br />Power generation at the Colorado River Storage Project power plants for March 2005 is presented in <br />Table 4. Information shown was obtained from the monthly report of power operations, Bureau of <br />Reclamation, Upper Colorado Regional Office. <br /> <br />Table 4. Power generation at Colorado River Storage Proiect power plants. March 2005 <br /> <br />Fontenelle <br />Flaming Gorge <br />Blue Mesa <br />Morrow Point <br />Crystal <br />Lower Molina <br />Upper Molina <br />Glen Canyon <br />Total: <br /> <br />NET GENERATION <br />March 05 <br />(MW hrs) <br />4,510 <br />19,551 <br />18,387 <br />24,085 <br />13,495 <br />42 <br />96 <br />300,312 <br />380,478 <br /> <br />4 <br /> <br />CUMULATIVE <br />WATER YEAR <br />2005 <br />Oct 04-Sept 05 <br />(MW hrs) <br />29,282 <br />103,330 <br />62,537 <br />81,373 <br />29,557 <br />4,540 <br />6,552 <br />1,527,039 <br />1,844,210 <br />