My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP12936
CWCB
>
Water Supply Protection
>
DayForward
>
1001-2000
>
WSP12936
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:34:17 PM
Creation date
3/27/2008 11:25:45 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.35
Description
Colorado River Basin Monthly Content Reports
Basin
Colorado Mainstem
Date
1/20/2004
Author
Upper Colorado River Commission
Title
2004 reports: Content and Power Generation and Streamflow of Selected Colorado River Basin Reservoirs and Tributaries
Water Supply Pro - Doc Type
Data
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />... <br /> <br />FORECAST <br /> <br />According to the November 15,2004 final forecast, the October 2004 inflow to Upper Basin Reservoirs ranged from 78% to <br />120% of average. <br /> <br />Table 3. <br /> <br />Forecast and inflow comparisons of the Upper Colorado River Basin Reservoirs <br /> <br />Oct 04 <br />INFLOW <br />(1000 a.f) <br />Lake Powell 505 <br />Flaming Gorge 68 <br />Blue Mesa 28 <br />Fontenelle 54 <br />Navajo 55 <br /> <br />POWER GENERATION <br /> <br />PERCENT <br />OF <br />AVERAGE <br />92% <br />105% <br />78% <br />104% <br />120% <br /> <br />Oct 04 <br />INFLOW <br />FORECAST <br />o <br />o <br />o <br />o <br />o <br /> <br />PERCENT <br />OF <br />AVERAGE <br />0% <br />0% <br />0% <br />0% <br />0% <br /> <br />Power generation at the Colorado River Storage Project power plants for October 2004 is presented in <br />Table 4. Information shown was obtained from the monthly report of power operations, Bureau of <br />Reclamation, Upper Colorado Regional Office. <br /> <br />Table 4. <br /> <br />Power generation at Colorado River Storage Proiect power plants. October 2004 <br /> <br />FonteneIle <br />Flaming Gorge <br />Blue Mesa <br />Morrow Point <br />Crystal <br />Lower Molina <br />Upper Molina <br />Glen Canyon <br />Total: <br /> <br />NET GENERA nON <br />October 04 <br />(MW hrs) <br />3,692 <br />16,262 <br />15,969 <br />18,896 <br />6,899 <br />1,713 <br />2,930 <br />190,837 <br />257,198 <br /> <br />4 <br /> <br />CUMULA nVE <br />WATER YEAR <br />2005 <br />Oct 04-Sept 05 <br />(MW hrs) <br />3,692 <br />16,262 <br />15,969 <br />18,896 <br />6,899 <br />1,713 <br />2,930 <br />190,837 <br />257,198 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.