Laserfiche WebLink
<br />e <br /> <br />e <br /> <br />POWER GENERATION <br />Power generation at the Colorado River Storage Project power plants for March 2003 is presented in table 4. Information <br />shown was obtained from the monthly report of power operations, Bureau of Reclamation, Upper Colorado Regional Office. <br /> <br />Table 4. <br /> <br />Fontenelle <br />Flaming Gorge <br />Blue Mesa <br />Morrow Point <br />Clystal <br />Lower Molina <br />Upper Molina <br />Glen Canyon <br />Total: <br /> <br />Power generation at Colorado River Storage Project DOwer Dlants. March 2003 <br /> <br />CUMULATIVE <br />WATER YEAR <br />NET GENERATION 2002 <br />FOR MARCH 03 (OCT02-MAR03) <br />(MW hrs) (MW lrrs) <br />3.892 15,371 <br />16.790 99,503 <br />2,012 20,985 <br />5.104 31,583 <br />1,208 4,120 <br />o 3,031 <br />o 5,256 <br />333,239 1,665,841 <br />362.245 1,845,690 <br /> <br />4 <br /> <br />