Laserfiche WebLink
<br />Date: April 12, 2004 <br /> <br />From: <br /> <br />Water Resource Group, Salt Lake City <br /> <br />To: <br /> <br />All Colorado River Annual Operating Plan (AOP) Recipients <br /> <br />Current Status <br /> <br />March <br />inflow (unreg) <br />(Acre-Feet) <br /> <br />Percent <br />of normal <br /> <br />Midnight <br />April 11 <br />Elevation <br /> <br />Reservoir <br />Storage <br />(Acre-Feet) <br /> <br />Fontenelle <br />Flaming Gorge <br />Blue Mesa <br />Powell <br />Navajo <br /> <br />23,000 <br />33,000 <br />20,000 <br />245,000 <br />23,000 <br /> <br />79 <br />70 <br />88 <br />58 <br />77 <br /> <br />6482.85 <br />6009.79 <br />7470.60 <br />3583.02 <br />6010.79 <br /> <br />183,000 <br />2,634,000 <br />440,000 <br />10,200,000 <br />829,000 <br /> <br />Expected Operation <br /> <br />FONTENELLE - The current elevation of Fontenelle Reservoir is 6483.07 feet above sea level. <br />Releases are steady at about 750 cfs and the inflows are averaging about 1500 cfs. <br /> <br />Snowpack conditions above Fontenelle decreased significantly during the month of March. As of <br />March 1st, 2004 the snowpack above Fontenelle Reservoir measured 88.2% of normal. As of April <br />1 st, the snowpack measured 74.5% of normal and as of April 13th the snowpack now measures 62.7% <br />of normal. The snowpack building season is nearly complete for 2004. <br /> <br />The Colorado Basin River Forecast Center (CBRFC) has updated the 2004 Water Supply Forecast <br />for Fontenelle to 500,000 acre-feet (58% of normal) for the period from April through July. This is <br />down 125,000 acre-feet from on month ago. It is still very likely that Fontenelle Reservoir will fill <br />during the summer of2004. The reservoir elevation is currently 6483.07 feet above sea level and <br />increasing. Releases are currently near 750 cfs and will likely be increased to about powerplant <br />capacity (~1500 cfs) by the end of April. By late July Fontenelle will be very nearly full depending <br />on how much inflow Fontenelle receives over the next 4 month. <br /> <br />Open forum discussions on Fontenelle operations take place at the "Fontenelle Reservoir Working <br />Group" meetings. The Working Group is a forum for information exchange between Reclamation <br />and other parties associated with the operation ofFontenelle Reservoir. The public is encouraged to <br />attend and express their concerns and interests with regard to Fontenelle Reservoir operation. The <br />next Working Group meeting is scheduled for April 14th, 2004 at 10:00 a.m. and will at the <br />Wyoming Fish and Game office located in Green River Wyoming. For more information about the <br />Working Group, contact Ed Vidmar at 801-379-1182. <br />