My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP12918
CWCB
>
Water Supply Protection
>
DayForward
>
1001-2000
>
WSP12918
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:34:12 PM
Creation date
3/25/2008 9:14:23 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8444.100
Description
Tamarack Plan
State
CO
Basin
South Platte
Date
4/24/2000
Author
Varied
Title
Colorado's Tamarack Plan Project Planning - Data
Water Supply Pro - Doc Type
Project Overview
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. 3-recharge ponds <br />. _miles of pipeline <br />. "Stafford Creek" <br /> <br />Brassy minnows (a species of concern) are being raised in Pond 3 <br />Suckermouth minnows (a species of concern) are being raised in Stafford Creek <br /> <br />Capital expenditures to date have been: <br /> <br />. $205,000 CWCB <br />. $209,000 CDOW <br />. $80,000 HB1006 <br />. $40,000 Ducks Unlimited <br />· $30,000 U.S. Bureau of Rec1amtion <br />$564,000 Total <br /> <br />c.. LVLJ};. r",-,is a- v t.'~ f -to f "':>'1 ~--- <br /> <br />The monthly pumping cost is approximately $1100 to pump all 10 wells. <br /> <br />V. Recharge credits to date have all gone to well augmentation and been split 50\50 <br />between GASP and LSPWCD. Lease charge has been $7.50\AF. The cost has <br />been about $11.00\AF to develop. <br /> <br />VI. The current vision for a complete Tamarack Plan is as follows: <br /> <br />Tamarack SW A <br />Pony Express SW A <br />Red Lion SW A <br />Sedgwick SW A <br />State Land Board <br /> <br />Complete <br />10-wells <br /> <br />Decreed <br />17- Wells <br /> <br />Current Yield <br />3,365 AF* <br /> <br />Est. Total Yield <br />10,100 <br /> <br />Private Lands <br /> <br />5,400 AF <br /> <br />Existing Ditch <br />(Up River) <br /> <br />8,500 AF** <br /> <br />8,500+ AF <br /> <br />Existing Ditch <br />(Down River) <br /> <br />3.500 AF <br /> <br />Total Recharge <br /> <br />27,500 AF <br /> <br />*Presently, the 10-wells at Tamarack would also provide 1,446 AF of well <br />augmentation water. The balance of water that is returned simply returns at a <br />time when it can not credited. <br />
The URL can be used to link to this page
Your browser does not support the video tag.