Laserfiche WebLink
<br />DOWNLISTING <br /> <br />HUMPBACK CHUB (Upper Basin and Lower Basin Recovery Units) <br /> <br />DELI STING <br /> <br />DEMOGRAPHIC CRITERIA ("self-sustaining with natural recruitment) <br /> <br />Over a 5-year monitoring period: <br />. Maintain the six populations ("no net loss"") <br />. One core population in upper basin> 2, I 00 a<;lults" <br />. One core population in lower basin > 2,100 adults" <br /> <br />RECOVERY FACTOR CRITERIA <br /> <br />Upper Basin Recovery Unit <br /> <br />1. Beneficial flow regimes identified, implemented, evaluated, and revised <br />2. Overutilization reevaluated and, if necessary, actions identified to ensure <br />adequate protection <br />3. Effects of diseases and parasites reevaluated and, if necessary, actions <br />identified to ensure adequate protection <br />4. Nonnative fish stocking procedures developed, implemented, evaluated, <br />and revised <br />5. Channel catfish control programs developed and implemented to identify <br />necessary control levels <br />6. Mechanisms determined for legal protection of habitat <br />7: Elements of conservation plans identified <br />8. Hazardous-materials spills emergency-response plans reviewed and <br />modified as necessary <br />9. Measures identified to minimize risk of hazardous-materials spills in <br />Black Rocks and Westwater Canyon from transport of materials along <br />adjacent railway <br />. 10. Locations of petroleum pipelines in 100-year floodplain of critical habitat <br />identified and need for emergency shut-offvalves.assessed <br /> <br />Lower Basin Recovery Unit <br /> <br />Life stages and habitats in mainstem identified and relationships between <br />mainstem and Litlle Colorado River (LCR) determined <br />2. Beneficial operations.of Glen Canyon Dam and flow regimes in LCR <br />identified, implemented, evaluated, and revised <br />3. . Effects and feasibility ofTCD for Glen Canyon Dam determined <br />4. Overutilization reevaluated and, if necessary, actions identified to ensure <br />adequate protection . <br />5. Asian tapeworm control program developed and implemented in LCR to <br />identify necessary control levels <br />6. Nonnative fish stocking procedures developed, implemented, evaluated, <br />and revised for mainstem and tributaries in Grand Canyon <br />Rainbow trout,channel catfish, black bullhead, and common cal1l control <br />programs developed and implemented to identify necessary control levels '. <br />inLCR .. <br />Brown trout and rainbow trout control programs developed and <br />implemented to identify necessary control levels in mainstem in Gran.d <br />Canyon <br />Mechanisms determined for legal protection of habitat in mainstem and <br />LCR <br />10. Elements of conservation plans identified <br />I I. Hazardous-materials spills emergency-response plans reviewed and <br />modified as necessary <br />12. Measures identified to minimize risk of hazardous-materials spills from <br />transport of materials along U.S. Highway 89 and near the two Cameron <br />bridges spanning the LCR <br /> <br />1. <br /> <br />7. <br /> <br />8. <br /> <br />9. <br /> <br />DEMOGRAPHIC CRITERIA ("self-sustaining with natural recruitment) <br /> <br />For 3 years beyond downlisting: <br />. Maintain the six populations ("no net loss"") <br />. Two core population in upper basin; each> 2,100 adults" <br />. One core population in lower basin > 2, I 00 adults" <br /> <br />RECOVERY FACTOR CRITERIA <br /> <br />Upper Basin Recovery Unit <br /> <br />I. Necessary flow regimes provided <br />2. Adequate protection from overutilization attained <br />3. Adequate protection from diseases and parasites attained <br />4. Nonnative fish stocking procedures finalized and implemented <br />5. Identified levels of channel catfish control attained <br />6. Necessary habitat legally protected in perpetuity <br />7. Conservation plans developed and implemented, and necessary <br />agreements executed <br />8. Flow regimes provided that reflect inter-annual variability in hydrologic <br />conditions to maintain natural proportions of Gila species and intergrades <br />9. Emergency-response plans for hazardous-materials spills implemented <br />10. Measures finalized and implemented to minimize risk of hazardous- <br />materials spills in Black ROcks and Westwater Canyon from transport of <br />materials along adjacent railway <br />II. Emergency shut-off values installed on problematic petroleum pipelines <br /> <br />Lower Basin Recovery Unit <br /> <br />I. Appropriate habitats in mainstem provided <br />2. Necessary flow regimes provided in mainstem and LCR <br />3. TCD for Glen Canyon Dam implemented, if determined feasible and <br />necessary <br />4. Adequate protection. from overutilization attained <br />5. Identified levels of Asian tapeworm control in LCR attained <br />. 6. Nonnative fish stocking procedures finalized and implemented <br />7. Identified levels of rainbow trout, channel catfish, black bullhead, and <br />common cal1l control attained in LCR <br />Identified levels of brown trout and rainbow trout control attained in <br />mainstem in Grand Canyon <br />Necessary habitat legally protected in perpetuity <br />Conservation plans developed and implemented, and necessary <br />agreements executed <br />Emergency-response plans for hazardous-materials spills implemented <br />Measures finalized and implemented to minimize risk of hazardous- <br />materials spills from transport of materials along U.S. Highway 89 and <br />near the two Cameron bridges spanning the LCR <br /> <br />8. <br /> <br />9. <br />10. <br /> <br />I], <br />. 12. <br />