Laserfiche WebLink
<br />46TH ANNUAL REPORT <br />FOR THE PICK-SLOAl'; lVlISSOlJRI BASIN PROGRAlVl <br />\YESTERl\ DIVISION SYSTElVl PO\VER OPERATIONS <br /> <br />*x*~*~**** <br /> <br />This is the 46th annual repon for the Pick-Sloan ~1issouri Basin Program \Vestern <br />Diyision System (System) power operations. For the purpose of this report. the System <br />also includes the Yellowtail Power Plant units 1 & 2 and the generating facilities ofthe <br />Fryingpan-Arkansas Project. The purpose of the repon is to inform interested parties of <br />the generation and pump energy requirements of the hydropower system. The report <br />consists of two pam;: One pan describes the actual generation and pumping operations <br />for water year 1997 and the other pan presents the plan of generation and pumping <br />operations for water year 1998. <br /> <br />An update on the System generation and pumping operations is included in the "Water <br />Supply and Ctilization" repon. which is issued monthly. <br />