Laserfiche WebLink
<br />TABLE 4 <br /> <br />COLORADO-BIG THOMPSON PROJECT <br /> <br />FLOOD DAMAGE PREVENTED IN 1997 <br /> <br /> Cumulative Cumulative <br /> Total Total <br />Dam Prior to 1997 1997 Current <br />Granby $228,000 $0 $228,000 <br />Green Mountain $62,000 $12,000 $74,000 <br />Total $290,000 $12,000 $302,000 <br /> <br /> <br />