Laserfiche WebLink
<br />II Table C.1. Estimated Costs Durino SPDSS Imolementation for Surface Water Alternatives <br />II Surface Water Planning Alternative 1 I Reference Alternative 2 I Reference Alternative 3 I Reference II <br />II Description I Section Total Cost Description Section Total Cost Description I Section Total Cost II <br />1If".IIII;.m~~ll' 41 , <br /> Complete task (costs assume a 1950 Nothin9 added (costs assume a 1950- Nothin9 added (costs assume a <br />Researchlidentify appropriate study period present study period) 5.2 $9,000 present study period) $9,000 1950-present study period) $9,00( <br /> Records at least 70 % complete <br />Identify key streamflow gages and estimate throughout study period (approx. 63 <br />streamflows for missing records gages) 5.3.1.1.1 $47,000 Nothing added $47,000 Nothing added $47,00( <br /> Structures comprising more than an Structures comprising more than an <br /> average annual diversion of 5,000 ac average annual diversion of 2000 ac-ft <br /> ft (approximately 163 structures or (total of approximately 319 structures or <br />Identify key diversion structures, QAlQC diversion 75% of annual diversions); fill 85 percent of annual diversions); fill <br />data, and fill missing data for 25% of structures monthly data for 41 diversions 5.3.1.1.2 $121,000 daily data for 80 diversions 5.4.1.1.2 $273,000 Nothing added $273,00 <br />Identify key transmountaln diversion structures and <br />filllresolve conflicting records (19 total structures) 1 g transbasln structures 5.3.1.1.2 $54,000 Nothing added $54,000 Nothing added $54,00 <br /> 50 greater than 10,000 ac-ft & 9 <br /> smaller than tO,OOO ac-ft (approx. <br /> 85% of total storage); fill missing Fill missing records on a daily basis for <br />Identify key storage elements and fill missing records monthly records 5.3.1.1.2 $118,000 59 storage elements 5.4.1.1.2 $149,000 Nothing added $149.00 <br />River call data collection Not included $0 Collect and evaluate river call data 5.4.1.1.3 $56,000 Nothing added $56,00 <br />lAugmentatlon plan, substitute supply plan, and <br />transfer decree data Not Included $0 Data for 10 largest plansltransfers 5.4.1.1.3 $64,000 Data for 40 largest plans/transfers 5.5.1.1 $259,00( <br /> Develop plan for Altemative 1 field Develop plan for Altemative 2 field Develop plan for Alternative 3 field <br />Field Wor!< Plan development activities 5.3.1.1 $9,000 activities 5.4.1.1 $14,000 activities 5.5.1.1 $56,00( <br />Point flow investigations per SB-74 <br />recommendations to support groundwater modeling Monitoring 2 timeslyear for 2 years at <br />of Denver Basin alluvium 25 sites overiying the Denver Basin 5.3.1.1.3 $218,000 Nothing added $218,000 Nothing added $218,00 <br /> Monitoring 4 times over 2 years along Monitoring 6 times over 2 years <br /> the Lower South Platte from SI. Vraln along the Lower South Platte from <br />Point flow Investigations per Division 1 need for River to Julesburg (conducted by SI. Vraln River to Julesburg <br />Improved administration DWR) 5.3.1.1.3 $106,000 Nothing added $108,000 (conducted by DWR) 5.5.1.1 $134,00 <br /> Collect flow routing & channel <br />Flow routing data collection Not Included $0 Not Included $0 characteristics data 5.5.1.1 $167,00 <br /> Satellite monitoring systems on 6 Satellite monitoring systems on 10 <br /> diversion structures (non- diversion structures (non- <br />Install new satellite monitoring systems on existing transmountaln) and 2 transmountaln transmountaln) and 2 transmountaln <br />diversion structures Not Included $0 diversion structures 5.4.1.1.4 $135,000 diversion structures 5.5.1.1 $203,00 <br /> 1 new stream gage on S Platte R below <br />Install new standard stream gages Not Included $0 Julesburg (Installed by DWR) 5.4.1.1.4 $19,000 Not Included 5.5.1.1 $( <br /> 8 new stream gages on S Platte R <br /> 1 new stream gages on S Platte R at and tributaries (Installed by <br />Install new standard stream gages Not Included $0 Alwood (installed by Consultant) 5.4.1.1.4 $53,000 Consultant) 5.5.1.1 $431,OO( <br />1C0nceptual Design Investigation (CDi) for rated Conduct CDI and develop <br />controlled section gage Not Included $0 Not included $0 recommendations 5.5.1.1 $95,00 <br />Install new stream gages with rated controlled <br />section gages Not Included $0 Not Included $0 3 rated control sections and gages 5.5.1.1 $3,967,00 <br /> DWR Satellite Monitoring Program <br />Operate and maintain diversion structure gages Not included $( responsibility 5.4.1.1.4 $( Nothing added $ <br />Rate, operate, and maintain new standard stream Conduct for duration of SPDSS <br />ages Not Included $0 DWR Division 1 Engineer responsibility 5.4.1.1.4 $( Implementlon (5 years) 5.5.1.1 $218,00 <br />Rate, operate, and maintain rated control section DWR Division 1 Engineer <br />llIages Not Included $0 Not Included $( responslblilty 5.5.1.1 $ <br />Subtotal: Data Co//ecUon $682,000 $1,197,000 $6,336,000 <br /> <br />- <br />