Laserfiche WebLink
<br />"I <br /> <br />. <br /> <br />WIMPS Programmatic analysis for watershed improvements. This project will EA for comments <br /> conduct an environmental analysis for the various methods of protecting will be available <br /> soil, water and fisheries resources through land and other treatments. in the spring of <br /> Check dams, bank stabilization, revegetation, soil aeration, soil 2003. <br /> stabilization, fish structures, and other techniques will be analyzed. Contact <br /> JOHN RAWINSKI, Supervisor's Office,(719) 852~5941. .. <br /> <br />UTE TRAIL Relocation of less than Y2 mile for soil and water protection. Trailhead Scoping this <br /> located above Rio Grande Reservoir. ART MARCILLA, (719)657-3321, spring. <br /> Divide Ranger District. <br />BLANCAlELLINGWOOD This project involves relocation and improvement on the access Scoping and <br />AND LITTLE BEAR trail to these popular peaks in the Sangre de Cristo's. Project NEPA underway. <br />PEAKS location is approximately 8 miles NW of the town of Blanca. Scheduled for <br /> JIM HONG, (719) 274-8971, Conejos Peak Ranger District. 2004.. <br />MOON PASS OHV Project involves grading, shaping and definition of existing Complete NEP A spring <br />TRAILHEAD parking areas for South Carnero Trail, Miners Trail, and 2003 as needed to <br />IMPROVEMENT Bowers Peak Trail. Gravel surface may be applied and supplement Programmatic. <br /> trailhead signs installed. Contact JIM JAMINET or KRIST! Implement Summer 2003. <br /> MURPHY (719) 655-2547, Saguache Ranger District. <br />CHAMA BASIN This project involves rehabilitation of gullies across Trail 124 and NEP A complete. <br />TRAILS creating switchbacks in a steep section of Trail 741 to control erosion. <br /> JIM HONG, (719) 274-8971, Coneios Peak Ranger District. <br />UTE The Divide District is analyzing the possibility of relocating Public scoping expected in late <br />TRAILHEAD the Ute Creek Trailhead to a more suitable location to avoid April pending access to FS <br /> further damage to adjacent riparian zone. Contact ART interdisciplinary review team <br /> MARCILLA at the Divide Ranger District, (719) 657-3321. and budget constraints. <br />SOUTH ROCK The Divide District plans to improve the existing parking facilities at Public scoping <br />CREEK the South Rock Creek Trailhead. This project proposal is based on expected in April <br />TRAILHEAD trail users complaining of inadequate parking facilities for turning pending Engineering <br /> horse trailers and overnight parking for trail users. Project work Design, Forest Service <br /> would consist of minor cutting of cut-slope and using material on fill interdisciplinary team <br /> side to widen the existing facility. Contact ART MARCILLA at the review, and budget <br /> Divide Ranger District, (719) 657-3321. constraints. <br /> <br />TRAILS <br /> <br />CANON ALLOTMENT Environmental Analysis for an Allotment Management Plan on the Analysis starting in <br />AMP Canon C&H Allotment. Location is the Rio Grande drainage above January 2003. <br /> Rio Grande Reservoir, including West Lost Trail Creek, portions of <br /> Bear Creek and Pole Creek. GILBERT BECENTI (719) 657-3321, <br /> Divide Ranger District. <br />SOUTH SAN Environmental Analysis for the Jarosa Mesa, Dipping Lakes, Bancos Alazon, Delayed due <br />JUAN Glacier Lake, Twin Lakes, Roaring Fork, Saddle Creek & Mesa S&G to Reversal. <br />WILDERNESS Allotments. One EA and several Allotment Management Plans will be prepared <br />S&G for these allotments. These sheep allotments are located within the South San <br /> Juan Wilderness on the Conejos Peak Ranger District. Contact DEAN <br /> ERHARD at the Supervisor's Office, (719) 852-5941. <br />FOX CREEK, Environmental Analysis for Allotment Management Plan for the Fox Creek Delayed due <br />C&H cattle allotment located along Fox Creek drainage north of Magote, Colorado. to reversal. <br />ALLQTMENT Will be re-combined with the Long Park and Big Meadows C&H allotments. <br /> KELLY GARCIA(719) 274~8971, Conejos Peak Ranger District. <br />SULPHUR Environmental Analysis for an AllotmentManagement Planto be prepared for Scoping <br />C&H.AMP Sulphur Cattle and Horse Allotment located southwest of Cree de, COin the Trout February <br /> Creek drainage. GILBERT BECENTI (719) 657-3321, Divide Ranger District. 2003. <br />ALDER/SILVER Environmental Analysis for an Allotment Management Plan to be prepared Delayed due to <br />ALLOTMENT for the Alder Silver Allotment located north of Saguache, CO. Jim Jaminet reversal. <br />EA (719) 655-2547, Saguache Ranger District. <br /> <br />RANGE <br />