Laserfiche WebLink
<br />Cl3MBRES & TOL TEC I! Cumbres & T oltec Scenic Railroad, T32N, R5E, Se{; 7 & 8, T32N, R6E, <br />SCE~lC RAILROAD Sec P. Contact \VY01YIA, HAJ.~SEN (719) 852-5941, Supenisor's <br />Office. <br />Proposal from a citizen ofPagosa Springs, Colorado to hold a wedding <br />ceremony sometime during the last 10 days of June on National Forest <br />Land by Lobo Overlook on the Continental Divide. The number of guests <br />"\vould be approximately 125 and the number of vehicles would be <br />approximately 25. A parking lot and restroom that already exist would be <br />used at the overlook. The reception would be held in Pagosa Springs. <br />Project is in T38~_ R2E, Sec 32. Contact RO~1\;IE DAY at the Divide <br />Ranger District, (719) 657-33Jl <br />Proposal from permitted summer home owner David Silva to drill a <br />domestic well and pipe the water to the cabin. The cabin is located on the <br />Forest between South Fork and Wagon Wheel Gap in T40N, R2E, Sec 11. <br />The wel! permit and ""-ater rights would be in the name of the L'SFS for a <br />ma'i:llnum of 15 gallons per minute. The well would replace an <br />ii antiq~ated cis~e~ that gathe~ ~off~ehind ~e cabin. Contact RO!'l1'.IE <br />!I DA I at the Dm.de Ran!!:er DIsmct. ('119) 651-3321. <br />SA..'\\' uns VALLEY REC I' Installation of underground telephone and electric lines in Section 24, <br />AJ.'\TI CE~TLRY TEL ;: T 42 N., R 1\V. Contact WYOMA HANSEN, Supervisor's Office, <br />Ii (719) 852-5941. <br />!,!. Relocate (install new) gaging station on North Crestone Creek to a <br />location near lmver campsite (camp site #13) and remove old gaging <br />station. Colorado Division of Water Resources is proponent and <br />needs to replace existing gage because it is ineffective during high <br />flm,ys. T 44X. RIlE, Sec 31. Contact JL\cI J."--\cH~i:T, (719) 655- <br />2547. Saguache Ranger District. <br />TEMPORAR.Y SPECIAL USE !l Loading of water trucks from Pass Creek for <br />PER.'IIT FOR LO.-\D~G OF Ii Highway 160 reconstruction project. T38K, R2E, <br />WATER TRL"CKS II Section 9, }"~1PM. Mineral Countv Colorado <br />SLY REC II The proposal involves placement of an <br />underground electric line in Sec 24, T42N, RIW. <br />.\ ~~1P~L :Ylineral County. Contact \VYOMA <br />.1 <br />U HA.:."\SE~, Supen-isor's Office, (719) 852-5941. <br /> <br />. . <br /> <br />, <br /> <br />\VEDDNG <br />CEREMOr,;-y O~ LOBO <br />OVERLOOK <br /> <br />DOMESTIC WELL TO <br />BE DRILLED AT <br />Sl!~IMER HO!\.lE <br /> <br />~ORTII <br />CRESTO~E <br />GAGING <br />STATIO~ <br /> <br />l\IIl'lERALS <br /> <br />Ongoing <br /> <br />Scoping <br />expected in <br />February or <br />::Vlarch. <br /> <br />Scoping <br />expected in <br />j; February or <br />March_ <br /> <br />Ongoing <br /> <br />Ii Complete NEPA '\\'inter! <br />l~I'I_ spring 2003 , install new <br />gage and remove old gage. <br />spring or summer 2003. <br /> <br />Implementation May 2003 <br /> <br />Ongoing <br /> <br />I <br /> <br />DIVIDE R.'\.,,'l"GER ; The Colorado Division of~linerals and Geolo!!:v will close two abandoned Analysis in <br />. - -... <br />DISTRICT ! mines. One shaft is on \V olf Creek Pass and one shaft is in Miners Creek. progress. Expe-ete-d <br />ABA...""\TIO?>i""ED "\1D.""E I Sites will either ~be back1~lled o~~losed us~g. a bat-compa~bl~ gate. completion fall <br />CL OSl;""RES I Contact DIi\-,-'\"N GESE (fl9) 6:)/-6025, Dmde R.anger DIStrIct 2003. <br />TA.-" JACK CL~lS OPERATING! 150 foot-long exploration trench. Old \Vomans' Creek, Eli2 Scoping in summer. <br />PLA!., TREASL""RE TROVE ; Sec 8, T41N., R5E Contact DLo\!~ GESE, (719) 657-6025, <br />PERMIT I Dhide Ranger District. <br />COTTON CREEK ! The Colorado Division of :Minerals & Geology south of Cotton Creek \\-ill close 12 .Analysis <br />AB.-\i.'\TI01\""ED ~1D.""E i abandoned mines. Sites wi!l either be back-filled or closed using a bat-compatible m <br />CLOSURES ! gate. Contact DL~'\""N GESE, (719) 657-6025, Saguache Ranger District. progress. <br /> <br />\VILDLIFE AND FISHERIES <br /> <br />SCHR.-\DER CREEK Parmership project designed to improye big game winter range by CE expected. <br />~lECH.-\.. ......ICAL reducing density of pinyon-juniper and wildland urban interface fuels Comments <br />TREA ThlEKT reduction. T 39X R5E Sec 20. DALE GOMEZ, (719) 657-3321, being <br /> , <br />Ii Diyide Ranger District. accepte-d. <br />CO}';i:JO~ RIVER'FOX Ii Project ""-ould open up underbrush increasing sight distance Project scheduled <br />CREEK BIGHORi"J SHEEP Ii for bighorn sheep. Approximately 50 acres would be treated for summer 2003. <br />HABITAT I"\-1PROVE~IENT Ii to improve habitat. S1:i: S\\"lFT-MILLER, (719) 274-8971. <br />PROJECT Ii <br />~HDDLE CREEK STREAi'--l :Nliddle Creek located above love Lake needs some Scoping I <br />D.1PROVE~lE~l rehabilitation of eroding banks through structure placement. Completed <br /> Contact DALE GOMEZ, (719) 657-3321, Divide Ranger Planned for I <br /> I District. Summer 2003 <br />. I <br />