Laserfiche WebLink
<br />Table <br /> <br />10.3 <br />10.4 <br />10.5 <br />10.6 <br />10.7 <br /> <br />10.8 <br />10.9 <br /> <br />10.10 <br />10.11 <br />10.12 <br />10.13 <br />10.14 <br /> <br />10.15 <br />10.16 <br /> <br />Figure <br /> <br />1.1 <br /> <br />2.1 <br /> <br />2.2 <br /> <br />2.3 <br /> <br />2.4 <br /> <br />2.5 <br /> <br />CONTENTS - Continued <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />,I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Page <br /> <br />Average annual changes in hydropower generation (GWhjyr) .......... 174 <br />Annual cost savings and benefits for baseline analysis ................ 175 <br />Agricultural support, free-market, and blended prices ................ 177 <br />Summarized net irrigation farm income, blended prices, by project area . . . 178 <br />Single-purpose alternative costs for domestic water benefits '(ODD DR) - <br />Sidi Mohammed Ben Abdellah Barrage Extension <br />(annual yield = 178 M m3) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 179 <br />Domestic water deliveries and calculated benefits ................... 180 <br />Summary of hydropower, irrigation, and domestic water <br />supply benefits (DR) ..................................... 181 <br />Summary of project costs ..................................... 182 <br />Summarized project costs (DR) ................................ 182 <br />Calculation of benefit-to-cost ratio .............................. 183 <br />Annualized excess of benefits over costs (DR) ..................... 183 <br />Summary of ONE RIVER Model results for the Oued Oum Er Rbia basin. <br />Average values for 1940-1985 period with monthly runs. . . . . . . . . . .. 187 <br />Sensitivity analysis for benefit-to-cost ratios. . . . . . . . . . . . . . . . . . . . . . .. 188 <br />Sensitivity analysis, benefits and costs (000 DR) .................... 189 <br /> <br />FIGURES <br /> <br />Principal organizations supporting the Moroccan Winter <br />Snowpack Augmentation Project - Programme AI Ghait <br />from the United States and Morocco ......................... 7 <br />Map of northern Morocco showing principal mountain ranges and <br />location of the target and control areas . . . . . .. . . . . . . . . . . . . . . . . . 31 <br />Map of central Morocco showing the project's field operations <br />sites, target and control areas, seeding generator sites, <br />and major observation sites for snowcourses and precipitation <br />gauges and rawinsondes ................................... 32 <br />Cross section of terrain along a line through the radar site <br />perpendicular to the crest of the High Atlas .................... 33 <br />Daily operational decision procedure showing the process by <br />which the operational status was determined in an objective <br /> <br />manner ................................:.............. 34 <br /> <br />Cloud physics and seeding aircraft, a Royal Moroccan Air Force <br />King Air 100 (a), with cloud physics instrument system (b), <br />and Lohse seeding generator (c) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35 <br /> <br />xxu <br />