My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WMOD00306
CWCB
>
Weather Modification
>
DayForward
>
WMOD00306
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2009 2:35:03 PM
Creation date
3/11/2008 11:21:41 AM
Metadata
Fields
Template:
Weather Modification
Project Name
Sierra Cooperative Pilot Project
Title
Sierra Cooperative Pilot Project - Operations Plan - 1986-1987
Date
10/1/1986
Weather Modification - Doc Type
Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />c. The crystal originating at this intersection will be used to calculate <br />the fallout point of that crystal. <br />d. Given that 90 percent of the nucleation at -6 oc will take place in <br />approximately 15 minutes, a certain spread will occur in the fallout foot <br />print footprint. A map of this footprint will be generated for each model <br />run. Nucleation will continue as the plume reaches colder and colder tem- <br />peratures but these footprints will not be calculated. <br /> <br /> <br />B. SKYWATER RADAR <br />A contractor group will operate the Skywater SWR-86 5-cm radar (table 3-1) at <br />Sheri dan duri ng the 1986-87 wi nter season. They wi 11 provi de all personnel <br />required to operate the radar for 24 hours per day during precipitation <br />events. The contractor will also provide a technician to calibrate the radar <br />on a non-interference basis each operational day and to be on call throughout <br />each day for radar maintenance and repair. <br /> <br />The Skywater radar will be operated routinely and data recorded as required on <br />all operational days. The radar shutdown time will be determined by the SCPP <br />Site Director or Seeding Coordinator. Under marginal weather conditions, the <br />radar will be operated occasionally to determine if echoes have developed in <br />the research area. Operations in this mode will support the AFO requirements <br />for radar information to classify cloud and storm types and aid in forecasting <br />the start of operations and provide a complete record of storm events before, <br />during, and after aircraft operations. During periods of no operations, the <br />radar will be checked for possible malfunctions. <br /> <br />The Skywater radar was refurbished between last field season and this coming <br />season. Several features were modified including the addition of a micro- <br />processor for scan control and modification of the scan converter system <br /> <br />1II-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.