Laserfiche WebLink
<br /> TABLE 1. FUNDING REQUIREl-IENTS <br /> San Juan Operational Cloud Seeding Project <br /> (Millions of Dollars) <br />Fiscal Operational Environmental Total Transferability Ground Based Total <br />Year Activities Activities Without Options Studies Studies With Options <br />1980 1. 70 0.10 1.80 0 0 1. 80 !/ <br />1981 8.13 0.75 8.88 0 0 8 .88 ]) <br />1982 3.90 0.70 4.60 2.05 0 6.65 <br />1983 4.00 0.35 4.35 1.00 1.65 7.00 <br />1984 3.75 0.35 4.10 1.00 0.75 5.85 <br />1985 3.75 0.35 4.10 1.00 0.75 5.85 <br />1986 3.75 0.35 4.10 1.00 0.75 5.85 <br />1987 3.75 0.35 4.10 1.00 0.75 5.85 <br />1988 4.05 0.30 4.35 1.15 0.95 6.45 <br />Totals $36.78 $3.60 $40.38 $8.20 $5.60 $54.18 <br /> <br />~/ Includes $393,000 now budgeted and an additional $1.4 million in FY 1980 required for critical <br />equipment procurement in order to start winter field studies in the 1980-1981 winter season. <br /> <br />~/ A Congressional addition of $8.51 million in FY 1981 to the present budget of $375,000. <br /> <br />