Laserfiche WebLink
, � 1J.LY <br />.��?i;i,",' <br />� ~ky t:, <br />1`� ` � <br />' <br /> �J <br />� <br />OLG:7J777�7Y <br />..� <br />I'7ClLtIYKt1l.Y'1 Y':1KKtK <br />rcaut l.� <br />t"tL�' L Ul 1 <br />I apologize for not getting back to you sooner but I have been trying to get someone from the AG's office to draft <br />a stipulation but there have been some big trials the last few w�eks and everyone is busy. So the purpose of my <br />email is to see if you can get Rose Marie Parker to drait a stipulation. <br />1 have tatked with Garrett and what we believe is fair is to sign a stipulation that would extend our agreement till <br />the end of July 06. What we are looking for is at the end of July 06 the BCRC will produce a preliminary <br />engineering document that will outline the preferred alternatives outlined in your letter. From July 06 forward we <br />will sign another stipulation with milestones for completing the project that you ouNined in your preliminary <br />engtneering document. Therefore, we expect at the end of ,1uty 06 you will have completed enough engineering <br />to outline the costs of your propose project, the financing of the project, the environmental review and permits <br />necessary for the project and the timeline for completing the project. <br />Let me know what you think and if you will have Rose Marie draft the stipulation to take us through July 06. <br />John <br />-----Original Mes.sage----- <br />From: Pinon5551@►aol.com [mallto:Plnon5551@aol.com] <br />Sent: Tuesday, �ept�ember 27, 2005 10:22 AM <br />TO: Sik01�� John <br />Ct: )ackson, Garrett; parkerrobtrosie@.luno.com; CwYier, Paul; C�vcranch@aol.com; <br />klever@ utswater�.org <br />Subject: (no subject) <br />� � ., <br />� <br />httv://webmailb.iurao.cc�z�a/webnnail/8?folder=RHPBusiness&unialv�s�Id=0013RNMi 0000... 12/24/2005 <br />