Laserfiche WebLink
LIST OF FIGURE�S <br />Figure 1 <br />Table 1 <br />Table 2 <br />Table 3 <br />Table 4 <br />Table 5 <br />Location Map and Service Area <br />LIST OF TABLES <br />Summary of Reservoir Capacity and Water Rights <br />Cost Es�imate for Rehabilitation and Enlargement of Bull Creek Reservoir <br />No. 4 <br />Source� of Funding <br />Financial Summary <br />Financi�l Ratios <br />LIST OF APPENDICES <br />Appendix A Articles of Incorporation and By-Laws for the Bull Creek Reservoir, Canal and <br />Power C:ompany <br />Appendix B Stipulation and Agreement befinreen Colorado Attomey General and Bult Creek <br />Reservoir, Canal and Power Company, 2003 <br />Appendix C Summary of Hydrology and Water Rights <br />Appendix D "75% D�esign" Drawings and Cost Estimates <br />Appendix E Altemateve Financing and Commitment of Collateral <br />Appendix F CWCB Construction Loan Application <br />Bull Creek Reservoir, Canal and Power Company <br />Bull Creek Reservoir No. 4, Feasibility Study <br />Nov. 30, 2006 11 <br />