My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150240 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150240 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2015 2:10:33 PM
Creation date
3/4/2008 10:53:26 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150240
Contractor Name
Bull Creek Reservoir, Canal & Power Company
Contract Type
Loan
Water District
0
County
Mesa
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
LIST OF FIGURE�S <br />Figure 1 <br />Table 1 <br />Table 2 <br />Table 3 <br />Table 4 <br />Table 5 <br />Location Map and Service Area <br />LIST OF TABLES <br />Summary of Reservoir Capacity and Water Rights <br />Cost Es�imate for Rehabilitation and Enlargement of Bull Creek Reservoir <br />No. 4 <br />Source� of Funding <br />Financial Summary <br />Financi�l Ratios <br />LIST OF APPENDICES <br />Appendix A Articles of Incorporation and By-Laws for the Bull Creek Reservoir, Canal and <br />Power C:ompany <br />Appendix B Stipulation and Agreement befinreen Colorado Attomey General and Bult Creek <br />Reservoir, Canal and Power Company, 2003 <br />Appendix C Summary of Hydrology and Water Rights <br />Appendix D "75% D�esign" Drawings and Cost Estimates <br />Appendix E Altemateve Financing and Commitment of Collateral <br />Appendix F CWCB Construction Loan Application <br />Bull Creek Reservoir, Canal and Power Company <br />Bull Creek Reservoir No. 4, Feasibility Study <br />Nov. 30, 2006 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.