My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01987 (2)
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
PROJ01987 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:36 AM
Creation date
3/4/2008 10:43:03 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0079FX
Contractor Name
Ortiz Ditch Company
Water District
0
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.i. <br /> <br />STATE OF C~OI-,ORADO <br /> <br />Colorado Water Conservation Board <br />Department of Natural Resources <br /> <br />721 State Centennial Building <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />Phone (303) 866-3441 <br />FAX (303) 866-4474 <br /> <br />. <br /> <br />Roy Romer <br />Govemor <br /> <br />MEMORANDUM: <br /> <br />James S. Lochhead <br />Executive Director, DNR <br /> <br />Daries C. Lile, P.E. <br />Director, eweB <br /> <br />(UPDATED February llO, 1995) <br /> <br />TO: Colorado Water Conservation Board Members <br /> <br />FROM: John Van Sciver <br /> <br />DATE: January 12, 1995 <br /> <br />SUBJECT: Agenda Item 20a., January 25-26, 19195, Board Meeting-- <br />Ortiz Ditch Company <br />Approval of a Construction Fund Loan in amount of $15,000 to refinance the <br />company's cost share to rehabilitate the diversion dam. <br /> <br />BACKGROUND <br /> <br />. The Ortiz Ditch Company, located in Conejoes County near La Jara, has submitted an <br />application for partial funding of the cost of rehabilitation of their diversion dam on the Alamosa <br />River. The project has been completed, and they are requesting a loan in the amount of $15,000 <br />(approximately 36% of the $42,058 total cost) to refinance their cost share. ASCS will fund <br />50% of the project, and the company is applying for slightly less than their 50% cost share, <br />since some of the individual shareholders have already paid in cash. <br /> <br />The project was needed because the previous diversion structure was constructed of rock, hay <br />bales and trees. <br /> <br />The new diversion structure is constructed of concrete, and in accordance with SCS plans and <br />specifications. Mr. Pete Gallegos (SCS, La Jara) performed inspections during construction to <br />assure a quality project. I visited the project on December 8, 1994, and answered questions <br />regarding CWCB loan funding. <br /> <br />The Ortiz ditch has a capacity of 14.02 CFS, and diverts approximately 1200 acre feet of water <br />per year. The total ditch length is approximately 7000 feet, and 440 acres are irrigated. There <br />are 10 shareholders on the ditch. " <br /> <br />DISCUSSION <br /> <br />This project has already been constructed. If the CWCB recommends this authorization to the <br />
The URL can be used to link to this page
Your browser does not support the video tag.