My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150037 Approval letter
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150037 Approval letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2010 2:51:06 PM
Creation date
3/4/2008 10:42:55 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150037
Contractor Name
Alamosa River Watershed Restoration Foundation, Inc.
Contract Type
Grant
Water District
35
County
Alamosa
Bill Number
HB00-1419
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Alamosa-La Jara Water Conservancy District <br />January 26-27,2000 <br /> <br />Agenda Item 12b. <br /> <br />2. Survey each sub-project area. <br />3. Develop a specific reconstruction design for each sub-project area. <br />4. Submit specific designs to the Army Corps of Engineers for approval. <br />5. Secure a rock source, and haul rock to the site. <br />6. Construct each sub project. <br />7. Select monitoring sites. Monitor water levels, river velocity, and bedload. <br /> <br />Discussion <br />A-LJWCD has received (or is expecting approval of) cash grants and in-kind services of over <br />$400,000 from a number of sources, for the Alamosa River Watershed Project. The Project has <br />proceeded with the cooperation and assistance of local landowners, as well as a broad range of <br />local, State, and Federal agencies. The project needs an additional $527,000 to complete the <br />restoration. The focus of Project efforts is a 4-mile section of river in the vicinity of Capulin, as <br />well as a 3.5-mile section upstream of Highway 285. A grant from the CWCS in amount of <br />$300,000 would greatly assist in the completion of 37 sub-projects within the high priority areas <br />of the river. <br /> <br />Recommendation <br />Staff recommends a grant in amount of $300,000 to the Alamosa-La Jara Water Conservancy <br />District for the Alamosa River Watershed Project. This grant will be used for engineering and <br />construction costs associated with Phases 1,2, and 3 reconstruction of the Alamosa River, as <br />defined in the scope of work. <br /> <br />Staff further recommends that approval of the grant be contingent upon CWCB Staff approval <br />of the final scope of work, and review of the specific project design. <br /> <br />cc: John Shawcroft, President Alamosa-La Jara Water Conse,rvancy District, PO Box 255, La Jara, CO 81140 <br />Linda Bassi, AGO <br /> <br />Attachment <br /> <br />C:\ W P51 \Proj-New\AlamosaRiverGrant 1 OOmemo <br />L:\boardmem\jan99\ 12b-JanOO <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.