My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01980 (2)
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
PROJ01980 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:35 AM
Creation date
3/4/2008 10:39:12 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0010X
Contractor Name
Broomfield, City of
Contract Type
Loan
Water District
0
County
Jefferson
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />SENT BY:Xerox Telecopier 7021 ;11-14-97 ; 2:32PM; <br />~ .' <br /> <br />3034366234'" <br /> <br />303 666 4474;# 1 <br /> <br />~ <br /> <br />J1l <br />p <br />1~ ! .J <br />h:~ ~:!'~ <br />..!P I.,,,r.;:. <br />"W.'f"~;~~; <br />'~~..JI~r~:-,~-,. <br /> <br />RECEIVED <br />NOV 14 1997 <br /> <br />City of Broomfield <br /> <br />,...~~~~ Water <br />VVlIMmIlIlion Board <br /> <br />ONE OESCOM8ES D~IVE <br /> <br />BROOMFIELD, CO 80020 <br /> <br />(303) 4e9-330' <br /> <br />November 14.1997 <br /> <br /> <br />7671 <br /> <br />Mr. John Van Sciver ' <br />Project Planning and Construction <br />Colorado Water Conservation Board <br />Department of Natural Resources <br />721 Centennial Building <br />1313 Sherman Street <br />Denver, CO 60203 <br /> <br />TO Jo <br />Co.ID~. <br />Phone' ", ..1'1'11 <br />Faxt ",.. ,1(79 <br /> <br />RE: Deauthorization of $3,000,000 Loan <br />HB 85.27 and HB 95.1155 <br /> <br />Dear Mr. Van Sciver: <br /> <br />The City of Broomfield is under the State Engineer's order to repair the spillway <br />of the Great Western Reservoir by October 1, 1998. We are presently doing a <br />site specific precipitation study to determine the extent to which the spillway <br />needs to be modified. This study should be completed by the end of the year. <br />Design of the spillway improvements will start immediately thereafter. The <br />design will be done by early spring at which time we will have an estimated cost <br />to construct the modifications. <br /> <br />The City is also participating in a study with the Denver Water Department and <br />other Northwest Quadrant Cities on water supply options. One of the options <br />could be to use Great Western to store return flow water that could be <br />exchanged elsewhere in the participants' systems, If this were to happen, the <br />joint use would require the expansion of the reservoir. The decision on this <br />option will not be made until the end of 1998. <br /> <br />Since the above projects are in progress, Broomfield requests that the eweB <br />loan authorization remain in effect at least until the end of next year. <br /> <br />Please call me at 438-8382 if you have any questions. <br /> <br />Sincerely I <br />
The URL can be used to link to this page
Your browser does not support the video tag.