Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />TABLE OF CONTENTS <br /> <br />Executive Summary <br /> <br />1. Introduction <br />A. Location <br />B. Project Scope <br />C. Project Goals <br /> <br />II. Project Parameters <br />A. Site Hydrology <br />B. Water Diversions/Delivery <br />C. Water Deliveries to the South Platte River <br />D. Water Supply <br />E. Permitting Considerations <br />F. Geotechnical <br />G. Recharge Potential/Stream Depletion Fa<etor Analysis <br />H. Compact Call Issues <br />1. Floodplain Issues <br /> <br />III. Preliminary Opinion of Probable Costs <br /> <br />IV. Conclusion and Recommendations <br /> <br />Bibliography <br /> <br />Tables <br />1 - GASP Ovid Wells Technical Data <br />2 - Water Available for Diversion <br />3 - Summary of Accretions to South Platte River from Recharge at Reservoir Site <br />4 - Operation of Reservoir to Maximize Average Number of Days Call Removed <br />5 - Preliminary Opinion of Probable Costs <br />6A - Estimate of Loan Amortization and Operating Expenses <br />6B - Estimate of Loan Amortization and Operating Expenses <br />6C - Estimate of Loan Amortization and Operating Expenses <br /> <br />Figures <br />1 - Vicinity Map <br />2 - Sources of Water Supply <br />3 - Historic Effectiveness of2,000 Acre-Feet Reservoir <br /> <br />Appendices <br />A - Geotechnical Data <br />B - Stream Depletion Analysis <br /> <br />Plates <br />I - General Plan <br /> <br />Page <br />1 <br /> <br />1 <br />2 <br />2 <br />3 <br /> <br />4 <br />4 <br />4 <br />6 <br />7 <br />8 <br />11 <br />11 <br />13 <br />13 <br /> <br />16 <br /> <br />21 <br /> <br />23 <br /> <br />5 <br />9 <br />12 <br />14 <br />17 <br />18 <br />19 <br />20 <br /> <br />After 2 <br />After 6 <br />After 13 <br /> <br />Pocket <br />