My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150262 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150262 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2012 7:55:49 AM
Creation date
3/4/2008 10:25:15 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150262
Contractor Name
Bennett, Town of
Contract Type
Loan
Water District
0
County
Adams
Arapahoe
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Town of Bennett <br />Feasibility Study <br />INTRODUCTION <br />The following presents a Feasibility Study in support of the loan request from the Town of <br />Bennett, Colorado (Bennett) to the Colorado Water Conservation Board's (CWCB) Construction <br />Fund. Water is provided to the residents of Bennett from the Denver Basin aquifers. 'The <br />requested loan would be used to replace a water supply well that was dually completed into the <br />Denver and Arapahoe aquifers in 1973. Over time, the condition and efficiency of Well 5 has <br />deteriorated beyond the point of repair. For Bennett to continue providing a reliable and high- <br />quality water source, the well must be replaced immediately. <br />Bennett is requesting a loan from the CWCB Construction Fund in the amount of $180,000 to <br />finance the re- drilling and completion of a critically needed Denver Basin water supply well. The <br />proposed project is eligible for a CWCB loan because it would replace a water supply well that <br />is critically needed to maintain adequate water service to the residents of Bennett. <br />This Report provides information on Bennett's water supply plan and system, water demands, <br />water rights, replacement plans, project alternatives, and financial feasibility. The structure of <br />this Report was based on information from CWCB staff and the Water Project Loan Program <br />Guidelines (CWCB, 2006). <br />STUDY OBJECTIVE <br />The purpose of this Feasibility Study is to outline and describe the project that will be <br />implemented if Bennett is granted the low interest loan from the CWCB Construction Fund. <br />Bennett is a community of 2,500 people that is located approximately 25 miles east of Denver, <br />Colorado in south Adams County and north Arapahoe County (Figure 1). Bennett currently <br />serves its residents with water that is pumped from Denver Basin aquifers. The water supply <br />system made up of the north water system (NWS) and the south water system (SWS). Well 5 is <br />one of six wells that supply the NWS, and it is one of four wells in the NWS that pump water <br />from the Denver or Arapahoe aquifers. Well 5 was taken off -line in September 2007 because <br />1 <br />Jehn Water Consultants, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.