My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150069 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150069 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2010 1:11:56 PM
Creation date
3/4/2008 10:05:47 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150069
Contractor Name
Colorado State University
Contract Type
MOU
Water District
0
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
350
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br /> <br />Residential Secondary Water Meters - Research Proiect <br /> <br />5.0 MARKET ANALYSIS <br /> <br />A market analysis will be conducted to determine the economic feasibility for a manufacturer to <br />design and produce a meter specifically for residential irrigation. The focus of this analysis will <br />be to determine the number of meters that could be sold tC' irrigation districts and <br />municipalities. A meter survey will be conducted (as discussed in Section 6.0) that will <br />determine the desire and ability of these water suppliers to purchase, install, and maintain <br />secondary water meters. <br /> <br />In this analysis, the following information will be gathered. <br /> <br />1. Number of meters that could be installed in the next 5 years in Utah <br /> <br />2. Municipalities and irrigation districts interested in investing in metering secondary <br />water within the next 5 years (to come from the survey discussed in Section 6.0) <br /> <br />3. Number of potential meter installations in Utah in the next 10 years in Utah <br /> <br />4. Municipalities and irrigation districts interested in investing in metering secondary <br />water within the next 10 years <br /> <br />5. Number of potential meter installations outside of Utah, particularly in the arid western <br />states - Idaho, Colorado, California, Arizona and Nevada. <br /> <br />Deliverable: Summary of results from the market analysis <br /> <br />10 <br /> <br />. <br />,~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.