My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150069 Approval Letter
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150069 Approval Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:35 AM
Creation date
3/4/2008 9:52:40 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150069
Contractor Name
Colorado State University
Contract Type
MOU
Water District
0
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />Colorado Water Conservation Board <br /> <br />Department of Natural Resources <br /> <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX: (303) 866-4474 <br />www.cwcb.state.co.us <br /> <br />STATE OF COLC)RADO <br /> <br />Q <br /> <br />Bill Owens <br />Governor <br /> <br />Greg E. Walcher <br />Executive Director <br /> <br />February 15, 2001 <br /> <br />Rod Kuharich <br />CWCB Director <br /> <br />Dan McAuliffe <br />Deputy Director <br /> <br />Ms. Marilee Rowe, Coordinator <br />Colorado Institute for Irrigation Management <br />B212 Engineering <br />Colorado State University <br />Ft. Collins, CO 80523 <br /> <br />RE: Dual Water Systems Study <br />Grant Recommendation <br /> <br />Dear Ms. Rowe, <br /> <br />I am pleased to inform you that the Colorado Water Conservation Board (CWCB) has <br />recommended your grant to the General Assembly for approval. We understand the grant <br />will be used for a study to assess the benefits and costs of Pressurized Dual Water <br />Systems in Colorado. <br /> <br />The Board recommended a grant from the Construction Fund in amount of $13:6,131. I <br />have attached a copy of the updated Board memo concerning the Colorado Institute for <br />I rrigation Management. Please refer to page 3 of that memo and to the section "Action <br />taken by the CWCB January 24,2001." <br /> <br />When the Board approves a grant from the Construction Fund there remain several <br />conditions: <br /> <br />a) An approved contract must be in place before funds can be advanced. Jan IlIian will <br />contact you concerning our contracting procedure. It usually takes about 2 months to <br />complete the contract after funds have been authorized by the General Assembly. <br /> <br />b) A detailed Scope of Work is required. John Van Sciver reviewed the scope of work <br />submitted with your application and found that it meets the requirements of thEl CWCS <br />Guidelines for financial assistance. <br /> <br />Flood Protection · Water Project Planning and Financing. Stream and lake Protection <br />Water Supply Protection. Conservation Planning <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.