Laserfiche WebLink
j <br />TIMNATH FLATIRON <br />RESERVOIR <br />CWCB LOAN APPLICATION <br />FEASIBILITY STUDY' <br />Prepared for: <br />RECEIVED LOWER POUDRE <br />DEC 2 2 2006 AUGMENTATION COMPANY <br />FEASIBILITY STUDY APPROVAL <br />1.0rado Water Pursuant to Colorado Revised Statutes 37- 60-121 &122, and <br />�+Qn3 Vanoftamd in accordance with policies adopted by the Board. the <br />Prepared b : CWCB staff has determined this Feasibility Study meets all <br />p Y applicable requirements for approval. <br />Applega e i Date <br />Group, Inc. <br />Consultants for Land, Minerals, and Water <br />AG File N'o. 05 -170 <br />December 2006 <br />