Laserfiche WebLink
<br />.... <br /> <br />. <br /> <br />. <br /> <br />4. -Tributary welles). are those wells that produce underground water and <br />ground water as defined in section 37-92-103(11), C.R.S. <br /> <br />B. AJJ.y other term used in these rules:thaIt is defined in Anicle 90 or 92 is used with <br />the meaning given therein. <br /> <br />Rule 3. All wells within the scope of these rules shall either, by July 1S, 1994, be equipped with <br />a totalizing flow meter that is i,ostalled and main~iuedaocording to m~nllfadUrer's specifications and <br />rec:oD:uoendatioDS or. by October 1. 1994, be rated to detecminc a' pow<< coefficient. <br /> <br />3.1 When a totalizing flow meter is used., it shall be the. owner's responsibility to keq> the meter in <br />acceptable operating condition. Any meter designed and manufactured for the purposeof,~uriog the <br />flow of water, and which has a totalizing feature; shall be considered to bc~ acceptable for pwrposes of <br />these rules. The State Engineer may adopt standards and specifications for the installation, repair, and <br />I'l)aint~.n,,~ of meters. As a minimum, totalizing flow meters ,shall be: properly verified in .the field <br />to be in accurate working ..condition UDder the ~upervision of an individual or entity approved annually <br />by the State,~ to do such tests when installed;,cootain sufficient rea>rding digits to assure that <br />-roll over- to zero does not occur within three years; and shall be maintained by the well owner so as <br />to provide a continuous, accurate record of withdrawals. If the meter is not operational, the well shall <br />not be pumped unless a working meter is installed or unless a specific backup water measurement <br />program approved by the State Engineer is put into effect. Totalizing flow meters are required to be re- <br />verified in the field to be in accurate working condition under the supervision of an individual or entity <br />annually approved by the State Engineer every four years after the date of original installation and flow <br />meters in existence as of the effective date of these rules shall be certified to be in accurate working <br />condition under the supervision of an individual or entity annually approved by the State Engineer by <br />June 15" 1995, and re-verified to be in accurate working condition every four years thereafter. The <br />Division Engineer shall be notified in writing of the date and person performing the re-verification . <br /> <br />3.2 The State Engineer may adopt standards and specifications for power coefficient testing. As a <br />minimum. power coefficients shall: be determined utilizing rating procedures approved by the State <br />Engineer and conducted under the supervision of an individual or entity annually approved by the State <br />Engineer to do such tests ; be conducted when the pumping system has stabilized, i.e., both operating <br />pressure and pumping drawdown has no~ changed more than 10% in the last hour; have been determined <br />on or after April 1. 1992; and be updated through re-rating at least every four years. The Division <br />Engineer shall be notified in writing of the date and person perfo~g the re-rating. <br /> <br />3.3 If the well(s) are part of a complex or compound system, or if the pump is driven by internal <br />combustion means. the owner or user of the well must utilize the totalizing flow meter method and the <br />provisions of Rule 3.1 apply. <br /> <br />; <br />3.4 All flow measuring equipment utilized in verification '6t accuracy and working condition in the <br />field and/or rating of wells must provide an accuracy within pltk..o.f minus 5 %. <br /> <br />2 <br /> <br />'. <br /> <br />\:... <br /> <br />~ <br /> <br />