My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150148 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150148 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2011 9:53:08 AM
Creation date
3/3/2008 3:26:17 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150148
Contractor Name
Ogilvy Irrigating and Land Company
Contract Type
Loan
Water District
3
County
Weld
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />the benefit to cost ratio of the reservoir and dam repair is as follows. <br /> <br />Benefit/Cost = [$2,500 x 1542 A-Ft] -7- $487,125 = 7.91 <br /> <br />COLLATERAL <br /> <br />OILC can offer the following collateral for the CWCB loan: <br /> <br />1. The revenue from assessments as allowed by the Company By-Laws and <br />Articles of Incorporation. <br /> <br />2. A certificate of deposit account in the amount of one annual payment to be <br />held by the State Treasurer. <br /> <br />3. The project itself. <br /> <br />IMPLEMENTATION SCHEDULE <br /> <br />The following schedule is proposed for implementation of the project based on the two <br />phases as outlined above. <br /> <br />Task <br />1. <br />2. <br /> <br />Feasibility Study <br />Construction <br />Loan from CWCB <br />Start Construction <br />Finish Construction <br /> <br />Tarqet Completion Date <br />6/01/2003 <br /> <br />07/30/2003 <br />09/01/2003 <br />12/15/2003 <br /> <br />SOCIAL, ECONOMIC, AND PHYSICAL IMPACTS <br /> <br />The project will have positive social impact as the reservoir is utilized for recreation. This <br />project will reduce the possibility of a storage restriction being placed on the reservoir. <br /> <br />The project will have a positive economic impact by assisting the Company to more <br />efficiently provide irrigation water to approximately 3600 acres of irrigated farm land. <br /> <br />The project will have no significant physical impacts except in the immediate vicinity of the <br />construction. These impacts will be minor in nature and will affect only a small area of less <br />than 1/2 acre. <br /> <br />Rehabilitation of Seeley Lake Outlet - Feasibility Study <br /> <br />Page 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.