My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01960 (2)
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ01960 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2011 3:27:31 PM
Creation date
3/3/2008 3:21:23 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150249
Contractor Name
Black Dike Pipeline Company
Contract Type
Loan
Water District
0
County
Montezuma
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Resources Conservation Service of the US Department of Agriculture. A preliminary <br />engineering and cost estimates for the Project has been made and is included in Appendix D. <br /> <br />The estimated cost of the Project is $598,146. The cost breakdown is summarized in Table 1. <br /> <br />Implementation Schedule <br /> <br />Harward Irrigation is expected to complete the final design by September 2007. Construction is <br />expected to begin October 2007 and to be completed by April 2008. <br /> <br />Permitting <br /> <br />All easements and rights of way have been secured. The Company expects to be exempt from <br />404 permitting by Statutory exemption, 33 CFR Section 323.4(a) 3. This will be confirmed with <br />the Army Corps of Engineers. <br /> <br />Institutional Considerations <br /> <br />Entities that are, or may be, involved in the design, construction, and financing of the project <br />include: <br /> <br />. <br /> <br />Harward Irrigation will engineer the pipeline and provide the required engineering <br />drawings. <br />Black Dike Pipeline Company; financing, constructi~;nd project management <br />Natural Resources Conservation Service (NRCS); "'r- cost share, design and <br />construction review. <br />Colorado Water Conservation Board (CWCB); financing. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />The Company will be the lead for the financing, design, and construction of the project and will <br />be the entity entering into contracts and agreements for the services to be provided. <br /> <br />Financial Analysis <br /> <br />The Company is applying for a loan from the CWCB in amount of $598,146, to cover total cost <br />of all construction and materials. u~n f al approval of the constructed Project by NRCS, <br />NRCS will pay to the Company the Yo cost share, which will be used by Company to pay <br />down the loan amount to approxim tely 207,000 <br /> <br />Table 2. Sources of Funding <br /> <br />Entity <br /> <br />Grant <br /> <br />Short-term <br />Loan <br />$598,146 <br />$0 <br />$0 <br />$598,146 <br /> <br />Long-term <br />loan <br />$207,000 <br />$0 <br />$0 <br />$207,000 <br /> <br />CWCB <br />Company <br />NRCS <br />Totals <br /> <br />$0 <br />$0 <br />$391,140 <br />$391,140 <br /> <br />The Company will cover any costs that exceed the NRCS estimated Project cost. <br /> <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.