Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Black Dike Pipeline Conpany <br /> <br />Supplemental Costs and Total Cost Summary <br /> <br />The Harward Irrigation Inc. (Marcel Orton) estimate of $539,146 includes all the <br />materials and installation labor for the inlet screen structure, piping, fittings, valves and <br />outlet structures for the entire project. There are a few items of significant cost that were <br />not included in the estimate. These items are listed below, the costs were estimated by <br />Marcel Orton and delivered to us verbally. <br /> <br />1) Settling pond <br />2) Dam improvements <br />3) Dedicated inspector <br />Total Supplemental Costs <br /> <br />$40,000 <br />4,000 <br />15,000 <br />$59,000 <br /> <br />(depends on water analysis results) <br />(to raise water level 12") <br /> <br />Pipeline Estimate <br />Total Cost Est. <br /> <br />$539.146 <br />$598,146 <br /> <br />short term loan request <br />