My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01960 (2)
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ01960 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2011 3:27:31 PM
Creation date
3/3/2008 3:21:23 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150249
Contractor Name
Black Dike Pipeline Company
Contract Type
Loan
Water District
0
County
Montezuma
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Black Dike Pipeline Conpany <br /> <br />Supplemental Costs and Total Cost Summary <br /> <br />The Harward Irrigation Inc. (Marcel Orton) estimate of $539,146 includes all the <br />materials and installation labor for the inlet screen structure, piping, fittings, valves and <br />outlet structures for the entire project. There are a few items of significant cost that were <br />not included in the estimate. These items are listed below, the costs were estimated by <br />Marcel Orton and delivered to us verbally. <br /> <br />1) Settling pond <br />2) Dam improvements <br />3) Dedicated inspector <br />Total Supplemental Costs <br /> <br />$40,000 <br />4,000 <br />15,000 <br />$59,000 <br /> <br />(depends on water analysis results) <br />(to raise water level 12") <br /> <br />Pipeline Estimate <br />Total Cost Est. <br /> <br />$539.146 <br />$598,146 <br /> <br />short term loan request <br />
The URL can be used to link to this page
Your browser does not support the video tag.