Laserfiche WebLink
<br />Agenda Item 291 <br />November 4, 1994 <br /> <br />3 <br /> <br />NOTE: On October 28, 1994 the Town's consultant provided an updated loan request which <br />narrowed the project, and reduced the total project cost to $750,000. Their loan request was <br />thus revised to $600,000 (75% of the total project cost.) In addition, the Town's Median <br />Household Income (MHI) of $18,705 is less than 80% of the State MID of $30,140, and <br />therefore staff recommended an interest rate of 4 % and a term of 30 years for this loan. The <br />following revised staff recommendation was presented to the board on November 4, 1994: <br /> <br />STAFF RECOMMENDATION (at the November 4. 1994 Board meeting): <br /> <br />1. That a construction fund loan in an amount of $600.000 (not to exceed 75% of <br />the total project cost) be approved for the Town of Paonia, to rehabilitan~ existing <br />reservoirs, or to construct a new raw water reservoir, and <br /> <br />2. That this loan shall be contingent upon completion of the feasibility study, and . <br />a finding that the selected alternative is feasible, and <br /> <br />3. That the fmancing terms shall be at an annual percentage rate of 4% ~md for a <br />duration of 30 years, and <br /> <br />4. That loan approval shall be contingent upon staff evaluation of the Town's <br />fmancial condition and ability to pay, and upon all standard contracting provisions <br />of the CWCB, and <br /> <br />5. That the loan shall be contingent upon the Town being UNABLE leo obtain <br />fmancing through the Colorado Water and Power Development Authority. <br /> <br />ACTION TAKEN BY THE CWCB NOVEMBER 4. 1994: <br /> <br />The CWCB approved the revised Staff recommendation exactly as presented at the <br />November 4, 1994 Board meeting. <br /> <br />Attachments <br />C:\wp51\john\29I.nov <br />