My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01958 (2)
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
PROJ01958 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:35 AM
Creation date
3/3/2008 3:04:58 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150131A
Contractor Name
Paonia, Town of
Contract Type
Loan
Water District
0
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />10 <br /> <br />, <br /> <br />Colorado Water Conservation Board <br /> <br />Department of Natural Resources <br /> <br />721 State Centennial Building <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />Phoue (303) 866-3441 <br />FAX (303)866-4474 <br /> <br />STATE OF COLO:RADO <br /> <br />. <br /> <br />Roy Romer <br />Governor <br /> <br />November 16, 1994 <br /> <br />James S. Locbbead <br />Executive Director, DNR <br /> <br />Ms. Joanne Fagan <br />Consolidated Consulting Services <br />P.O. Box 738 <br />Delta, Colorado 81416 <br /> <br />Daries C. Lile, P.E. <br />Director, CWCB <br /> <br />. Re: Town of Paonia <br /> <br />Dear Ms. Fagan: <br /> <br />We are in. receipt of your letter of October 26, 1994 regarding the proposed study for the Town of <br />Paonia. Based on our review and a staff discussion of the letter, we have a number of concerns we <br />would like to express. <br /> <br />The Plan of Study should include a budget for each work task, a schedule for completing each task and, <br />most importantly, a specific description of each task and each subtask as described on pages 11 and 12 <br />of the Construction Fund Guidelines. Task descriptions should be in sufficient detail to allow the <br />person reviewing the POS to understand specifically what alternatives will be considered, how the <br />alternatives will be evaluated and, in what sequence the work will be performed. The current documents <br />do not provide this. <br /> <br />It is not clear whether what is being proposed is a reconnaissance study for several alternatives to be <br />inveStigated at a very preliminary level of analysis or a more detailed feasibility study. Both types of <br />analysis are described in the Construction Fund Guidelines but it should be noted that the more detailed <br />feasibility study is required for Construction Fund financing approval. <br /> <br />In addition, we would like to request more information on the cost sharing arrangements with the Town <br />of Paonia. Our intention for the Small Dam Site Reconnaissance Program is that approximately fifty <br />percent of the proposed study costs be borne by the study sponsor. <br /> <br />We look forward to resolving these concerns at the earliest possible date so that the Town of Paonia <br />can continue to move forward with their water resource planning activities. Please feel free to call me <br />if you have any questions. <br /> <br />cc: Bill Stanton <br /> <br />Sincerely, <br /> <br />A~~ <br /> <br />William E. Green, P.E. <br />Project Planning and Construction <br />
The URL can be used to link to this page
Your browser does not support the video tag.