Laserfiche WebLink
<br />CWCB Construction Fund Loan Application <br /> <br />4, Please provide a brief description of l:he owner's existing water supply facilities and describe <br />any existing operational or maintenance problems. Attach separate sheets if needed, and a map <br />of the service area. Headgate on Seeley Lake Reservoir and approximatelv 80' of 24-inch outlet <br />pipe under dam and countv road needs to be replaced, <br />For existing facilities indicate: <br /> <br />Number of shareholders <br /> <br />34 <br /> <br />or Number of customers served <br /> <br />Current Assessment per share $ 140,00 <br />Number of acres irrigated approx. 3600 <br /> <br />Number of shares 360 <br /> <br />Part B. - Description of the Project <br />1. Naml~ of the project or facility Seelev Lake Outlet Rehabilitation Proiect <br />ISi'/2 /.LC <br /> <br />---.X_ <br /> <br />New project <br />Rehabilitation or replacement of existing facility <br />Enlargement of existing facility <br />Emergency Repair <br />Other (describe) <br /> <br />, Z tPoA C <br />E. ZZ,cr 10m ( <br />lOr {)fh <br /> <br />2. PUll'ose of this loan application. Chec:< one. <br /> <br />3. If the project is for rehabilitation of an existing reservoir, is the reservoir currently under a <br />storage restriction order from the State Engineer? YES ~ NO_ <br /> <br />4, General location ofthe project. (please include county, approximate distance and direction from <br />nearest town, as well as legal description, if known, Weld Countv-approx, 2 miles north <br />of Greelev on 35th Ave. T6N, R66W. 526. <br /> <br />5, Please provide a brief narrative description of the proposed project including purpose, need, <br />facilities, type of water uses to be served and service area. Attach separate sheet, if needed, _ <br />Replacement of head gate and outlet pipe, construction of a service and overflow spillwav, <br /> <br />Construction of a new gate tower, The water is used solelv for agricultural irrigation. The <br /> <br />Service area is shown on the attached service area map which is entirelv within Weld Countv. <br /> <br />Water Right: <br /> <br />91 <br /> <br />CFS. <br /> <br />Average water diverted per year: <br /> <br />acre- feet. <br /> <br />6. Will the acquisition of additional water rights be necessary? YES <br /> <br />NO X <br /> <br />If YES, please explain, <br /> <br />2 <br /> <br />CFLA602 <br />