Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />FUND REQUIREMENT SCHEDULE <br /> <br />The L TWD and the CWCWD are seeking funding through the Colorado Water <br />Conservation Board "Construction Fund" to finance $7,875,000 of the project. <br />The two Districts will fund the remaining amount with their cash reserves and <br />through an increase in their water rates. <br /> <br />The expected fund requirement schedule for the project, with an estimated <br />project total cost of $10,500,000 is as shown below. The 75% loan amount from <br />the CWCB will be $7,875,000 and the required 25% participation for the two <br />Districts will be $2,625,000. Each entity will borrow one half of the loan amount, <br />$ 3,937,500, from the CWCB. This schedule of when those funds will be needed <br />is based on design starting in 2003, construction starting in 2004 and being <br />completed in 2005. <br /> <br />The Fund Requirement Schedule shows the funds required by the Districts and <br />the CWCB to complete the project on the schedule shown in Table 2. In 2003, <br />funds will be required for engineering, surveying, subsurface investigations, <br />environmental assessment, and land acquisition. In 2004 and 2005 funds will be <br />required for engineering and construction. After 2005, the funds required by the <br />two Districts are the yearly payment for the CWCB loan repayment. <br /> <br /> <br /> <br />2003 $ 3;406,500 $ 2,554,875 $ 425,813 $ 425,813 <br />2004 $ 1,773,375 $ 1,330,031 $ 221,672 $ 221,672 <br />2005 $ 5;320,125 $ 3,990,094 $ 665,016 $ 665,016 <br />2006 <br />thru Annual Payment For 20 years $ 291,012 $ 293,590 <br />2025 <br />TOTALS $10,500,000 $ 7,875,000 $ 7,132,741 $7,184,301 <br /> <br />Note that the totals provided in Table 2 do not include the 10% reserve (for a total of one <br />payment) required by the CWCB to be placed in a Certificate of Deposit. This reserve is used to <br />make the final payment and does not change the overall cost of the project. <br /> <br />FINANCIAL ANALYSIS <br /> <br />The L TWO and the CWCWD propose to apply for a combined loan amount of <br />$7,875,000 from tre Colorado Water Conservation Board (CWCB). Each District <br /> <br />Dry Creek Reservoir Feasibility Study <br /> <br />23 <br />