My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150209 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150209 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2011 11:27:56 AM
Creation date
2/26/2008 11:56:19 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150209
Contractor Name
Central Weld County Water District
Contract Type
Loan
Water District
2
County
Larimer
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br />f- <br />'. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />I. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br /> <br />Chapter XIII - Conclusions <br /> <br />Chapter XIII - COlllclusions <br /> <br />The Districts have made the decision to construct a reservoir capable of storing <br />approximately 8,850 acre-feet of storage. The reservoir will provide carry-over storage for their <br />existing C-BT water in the future and during droughts, reduce the reliance on C-BT water delivery <br />infrastructure, and provide supplies so that water can be efficiently and immediately delivered to the <br />CLFP in response to customer demands. <br /> <br />The Districts' decision to pursue an 8,850 acre-foot reservoir instead of a 5,200 acre-foot is <br />based on the following considerations: <br /> <br />;.. A smaller reservoir may not be adequate to protect against long term drought <br />conditions; <br /> <br />;.. Minimize conflicts with property owners whose lands would be acquired for the <br />smaller reservoir and then again at a later date to accommodate a future enlargement; <br /> <br />;.. Enlarging the reservoir by raising the dam at a later date would be difficult due to the <br />inundation of embankment material necessary for the enlargement; <br /> <br />;.. Constructing the larger reservoir would prevent the Districts from having to repeat <br />the permitting requirements again in the future. <br /> <br />The project will cost approximately $21,600,000 or $2,440 per acre-foot without loan <br />interest and approximately $3,330 including interest for LTWD' s portion of the storage ,md $3,350 <br />for CWCWD's portion of the storage. This is a relatively reasonable storage cost and is less <br />expensive than other alternatives available to the Districts. <br />The project is expected to move forward without any significant issues. Construction is <br />scheduled to begin around October 1, 2005 and last for approximately one year. <br /> <br />Dry Creek Reservoir Project <br /> <br />31 <br /> <br />BOYLE <br />
The URL can be used to link to this page
Your browser does not support the video tag.