My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01948 (2)
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ01948 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:05:08 AM
Creation date
2/26/2008 11:49:24 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150121
Contractor Name
Little Thompson Water District
Contract Type
Loan
Water District
2
County
Weld
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
350
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />customers and CWCWD has budgeted $1,000,000 for rental water to meet the <br />needs of its cust~mers. Additionally, it is expected that the Northern Colorado <br />Water Conservancy District carry-over policy will be limited or discontinued in the <br />near future. Sub~equently, the Districts would be extremely vulnerable to annual <br />climate fluctuations and NCWCD water yield quota fluctuations. This alternative <br />was deemed unqesirable because it does not meet the need for raw water <br />storage. <br /> <br />Alternative 2 <br /> <br />i <br />I <br />This alternative cbnsists of constructing a reservoir including an earthen dam and <br />water delivery sy~tem at the location labeled Dry Creek Reservoir on Figure 2. <br />The dam would irppound up to 5200 ac-ft of water for use by Carter Lake Filter <br />Plant. An existing 20-inch steel pipeline would be used to transport water <br />between the filter plant and the reservoir. A new pumping facility would be <br />constructed to deliver water from the reservoir to the Carter Lake Filter Plant. <br />, <br />This alternative was selected as the most effective means of meeting the needs <br />of the Districts. i <br />I <br />, <br />, <br />I <br />i <br />, <br /> <br />Alternative 3 <br /> <br />This alternative cbnsists of constructing a dam at the location labeled Alternative <br />3 on Figure 2. Th~ dam would impound approximately 800 ac-ft of water. This <br />alternative was ruled out following preliminary geological, geotechnical, and <br />environmental e~aluation due to considerable geological complications and <br />environmental issues. The combination of small storage capacity and high cost <br />also made this alt~rnative unfeasible. <br /> <br />SELECTED ALTERNATIVE <br /> <br />The proposed DrY Creek Reservoir as described in Alternative 2 was selected <br />because it is the most feasible alternative for meeting the Districts' need for raw <br />water storage. It would consist of the following: <br /> <br />1. Construction of an approximately 5200 acre-foot reservoir including a 40- <br />foot high earthen dam with emergency spillway and outlet works. <br />2. Conversion' of an existing 20-inch treated water line to a raw water line to <br />connect the reservoir to the Carter Lake Filter Plant. <br />I <br />3. Constructi9n of a 5000 GPM pump station to pump water from the <br />reservoir to Carter Lake Filter Plant. The pump station will include a 24- <br />inch pipelin'e connecting to the existing 20-inch line and a 36-inch pipeline <br />connecting ito the reservoir outlet works. <br />, <br /> <br />, <br /> <br />Smith Geotechnical Engineering Consultants has conducted feasibility-level <br />design work for the proposed dam and TEC has conducted feasibility-level <br />design work for the proposed pump station. The site description for the selected <br />, <br /> <br />Dry Creek Reservoir Feasibility Study <br />, <br />I <br />I <br /> <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.