<br />RTW, Steffens & Associates (the ranch's engineer) and the Applegate Group have <br />worked on the conceptual design, plans and cost estimates. <br /> <br />The estimated cost is $1.6 million. Table 1 is a summary of the cost estimate. <br /> <br />Table 1. Project Cost Summary <br /> <br />Item <br />Mobilization <br />Low-Lift Pump Station <br />Low-Lift Forcemain <br />Hi-Lift Pump Station <br />Hi -Lift F orcemain <br />Demobilization <br />Contingencies <br />Engineering/DesignlConstruction <br />Management <br />Permitting <br />W ater Purchase/Water Court <br />Total <br /> <br />Cost <br />$89,824 <br />$274,000 <br />$256,268 <br />$320,000 <br />$312,631 <br />$11,228 <br />$183,578 <br />$168,891 <br /> <br />$28,000 <br />$125,000 <br />$1,769,420 <br /> <br />Implementation Schedule <br /> <br />It is anticipated that final design will be completed in early 2003 and project completion <br />date is scheduled for June 2003. <br /> <br />Permitting <br /> <br />Due to the potential impacts to wetlands and construction of an intake structure on the <br />Colorado River, this project may require a 404 permit from the Army Corps of Engineers. <br />The town is in process of determining the location of wetlands along the pipeline route <br />and evaluating the potential construction teclmique:s required to eliminate the need for a <br />permit. A meeting with the Army Corps will be held to determine final permitting <br />requirements once the Town completes a field evaluation in the month of October 2002. <br /> <br />Institutional Considerations <br /> <br />Entities that are, or may be involved in the design, construction, and financing of the <br />project include: <br /> <br />Town of Kremmling; Financing and project management. <br />RTW Engineers; Design and project management <br />Applegate Group; Permitting and water rights <br /> <br />8 <br />