My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150029 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150029 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2011 10:51:45 AM
Creation date
2/26/2008 10:59:02 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150029
Contractor Name
Chilcott Ditch Company
Contract Type
Loan
Water District
10
County
El Paso
Bill Number
EIA
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Implementation Schedule <br /> <br />The NRCS is expected to complete the final design by mid-January 2000. Construction is <br />expected to begin January 2000 and to be completed by May 2000. <br /> <br />Permitting <br /> <br />All easements and rights of way have been arranged for. The Company expects to be exempt <br />from 404 permitting by Statutory exemption, 33 CFR Section 323.4(a) 3. This will be confirmed <br />with the Army Corps of Engineers. <br /> <br />I nstitutional Considerations <br /> <br />Entities that are, or may be, involved in the desi~ln, construction, and financing of the project <br />include: <br /> <br />Chilcott Ditch (CDC); financing and project management. <br />Natural Resources Conservation Service (NRCS); financing, design, and construction. <br />Colorado Water Conservation Board (CWCB); financing and construction, <br /> <br />The CDC will be the lead for the financing, design, and construction of the projE3ct and will be <br />the entity entering into contracts and agreements with the various entities for the services <br />provided by each. <br /> <br />Financial Analysis <br /> <br />Several entities will be involved in financing the estimated total project cost of $1 million. The <br />CDC is applying for a loan from the CWCB in maximum amount of $250,000, to accommodate <br />the 25% Company cost share. The actual or estimated amounts by entity are given in Table 2, <br /> <br />Table 2. Sources of JFunding <br /> <br />Entity <br /> <br />Grant <br /> <br />Loan <br /> <br />Percent <br />Participation <br />25% <br />0% <br />75% <br />$1 million <br /> <br />CWCB <br />CDC <br />NRCS <br />Totals <br /> <br />$0 <br />$0 <br />$750,000 <br />$750,000 <br /> <br />$250,000 <br />$0 <br />$0 <br />$250,000 <br /> <br />The CDC will cover any costs that exceed the estimated project cost. <br /> <br />The CDC is requesting a 30-year loan from the CWCB. The standard agricultural lending rate <br />would be 4%, resulting in annual payments of $14,458. To this would be added $1,446 per year <br />for the first 10 years to fund the emergency reserve account, for a total annual cost of $15,903. <br /> <br />Chilcott Ditch Company <br />Diversion Structure Feasibility Study <br />November 1999 <br /> <br />Page 10 of 12 <br /> <br />I . <br />
The URL can be used to link to this page
Your browser does not support the video tag.