My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01936 (2)
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
PROJ01936 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:34 AM
Creation date
2/26/2008 10:47:12 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150022
Contractor Name
Riverside Reservoir and Land Company
Contract Type
Loan
Water District
0
Bill Number
HB 98-1189
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />- 3 - <br /> <br />e. Larimer County - Dry Creek Flood Mitigation Proiect - The CWCB approved a Severance <br />Tax Trust Fund Perpetual Base Account loan of$ll,OOO,OOOto Larimer County in 2001 for <br />the construction of a flood mitigation project along Dry Creek north of Fort Collins. The <br />project has recently been financed by the City of Fort Collins and the County has requested <br />de-authorization of this loan (attached letter). Staff recommends that the Board consider de- <br />authorization oftms loan. <br /> <br />Recommendation <br /> <br />Staff recommends the Board approve a one-year extension or de-authorization of the loan <br />authorizations, as described above, and as shown in the attached spreadsheet. <br /> <br />Flood Protection. Water Project Planning and Financing. Stream and Lake Protection <br />Water Supply Protection. Conservation Planning <br />
The URL can be used to link to this page
Your browser does not support the video tag.