My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01935 (4)
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ01935 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2010 9:29:07 AM
Creation date
2/26/2008 10:46:20 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153015
Contractor Name
Allenspark Water and Sanitation District
Contract Type
Loan
Water District
5
County
Boulder
Bill Number
SB 75-468
Loan Projects - Doc Type
Project Summary
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />.1 <br />I <br />I <br />'I <br />I <br />I <br />I <br /> <br />from Allenspar~ was trained to perform the inspection on <br />the project. This person later became certified as a <br />Class D water treatment plant operator and is currently <br />operating the plant and overseeing all maintenance on the <br />water system. During the first few months of operation, <br />the system has, performed quite well. The raw water only <br />I . <br />I <br />requires ch1or~nation for treatment, and the only problem <br />, <br />i <br />at the plant h~s been in keeping the turbidimeter in proper <br />adjustment. TWo valves had to be replaced on the distribution <br />system, but th~se were covered under warranty and replaced <br />! <br />at minimal or no cost to the Allenspark Water and Sanitation <br />District. There is still excess leakage occurring in the <br />distribution system, but the operator and engineering <br />consultant are! trying to isolate the problem. It appears <br />this problem will be resolved within a reasonable time. <br />Overall, this project has provided the people in <br />Allenspark witp a safe and :I:'eliable water supply on a year- <br />round basis. IBarring any unforeseen problems, the project <br />should provide' the people of Allenspark with a sufficient <br />I <br />quantity of good quality water for many years. <br /> <br /> <br /> <br />- 5 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.