My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150155 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150155 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2015 9:44:15 AM
Creation date
2/26/2008 9:58:55 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150155
Contractor Name
Rio Grande and Piedra Valley Ditch Company
Contract Type
Loan
Water District
20
County
Rio Grande
Bill Number
SPL
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />/ <br /> <br />Implementation Schedule <br /> <br />The NRCS is expected to complete the final design by mid-August 2003. Construction is <br />expected to begin in September 2003 and to be completed by November 2003. <br /> <br />Permitting <br /> <br />All easements and rights of way have been arranged for. The Company expects to be exempt <br />from 404 permitting by Statutory exemption, 33 CFR Section 323.4(a) 3. This will be confirmed <br />with the Army Corps of Engineers. <br /> <br />Institutional Considerations <br /> <br />Entities that are, or may be, involved in the design, cOl1struction, and financing of the project <br />include: <br /> <br />Rio Grande and Piedra Valley Ditch Company; financing and project management. <br />Natural Resources Conservation Service (NRCS); financing, design, and construction. <br />Colorado Water Conservation Board (CWCB); financing and construction, <br /> <br />The Company will be the lead for the financing, design, and construction of the project and will <br />be the entity entering into contracts and agreements with the various entities for the services <br />provided by each. <br /> <br />Financial Analysis <br /> <br />Several entities will be involved in financing the estimated total project cost of $69,333. The <br />Company is applying for a loan from the CWCB in the maximum amount of $52,000, to <br />accommodate the 25% Company cost share. The actual or estimated amounts by entity are <br />given in Table 2. <br /> <br /> Table 2. Sources of Funding <br />Entity Grant Loan Percent <br /> Participation / tI /c ( J.I!fJ <br />CWCB $0 $52,000 75% <br />Company $8667 $0 13% ,,:- <br />--- 5t-5 51 .? <br />NRCS $8666 $0 12% <br />Totals $17,333 $52,000 $69,333 OJ..>h I <br /> <br />The Rio Grande and Piedra Valley Ditch Company will cover any costs that exceed the <br />estimated project cost. <br /> <br />Rio Grande and Piedra Valley Ditch Company <br />Check Structure Feasibility Study <br />July 29,2003 <br /> <br />Page 10of15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.