My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01946 (3)
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
PROJ01946 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:05:08 AM
Creation date
2/26/2008 9:39:26 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0076FX
Contractor Name
Poudre Tech Metropolitan District
Contract Type
Loan
Water District
0
County
Weld
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />STATE OF COLORADO <br /> <br />Colorado Water Conservation Board <br /> <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone:~03)866-3441 <br />FAX: (303) 866-4474 <br />www.cwcb.state.co.us <br /> <br /> <br />Bill Owens <br />Governor <br /> <br />December 4, 2002 <br /> <br />Greg E. Walcher <br />Executive Director <br /> <br />Mr. Martin Lind, President <br />Poudre Tech Metro District <br />1625 Pelican Lakes Point, Suite 201 <br />Windsor, CO 80550 <br /> <br />Rod Kuharich <br />CWCB Director <br /> <br />RE: Dual Water System <br />Loan Recommendation <br /> <br />Dan McAuliffe <br />Deputy Director <br /> <br />Dear Martin, <br /> <br />I am pleased to inform you that the Colorado Water ConseNation Soard (CWCS) has <br />recommended your loan to the General Assembly for approval. Your loan request will be <br />included in the 2003 Water Project Construction Sill. Loan funds will be authorized in <br />spring 2003, once the Governor has signed the bill. I understand the loan will be used to <br />construct a raw water storage and distribution system for outside irrigation. <br /> <br />The Soard approved a loan from the Construction Fund in a maximum amount of <br />$2,180,000. The loan terms are 4.75% for 30 years, or 4.5% for 20 years, at your option. I <br />have attached a copy of the updated Soard memo concerning the Poudre Tech Metro <br />District. Please refer to page 4 of that memo and to the section "Action taken by the <br />CWCS November 26,2001." <br /> <br />When the Soard approves a loan there remain several conditions: <br /> <br />a) A Feasibility Study is required. John Van Sciver has reviewed the study titled <br />"Feasibility of Construction of a Raw Water Storage and Distribution System" prepared <br />by the District. The report meets the requirements of the CWCS Construction Fund <br />Guidelines for feasibility studies. <br />
The URL can be used to link to this page
Your browser does not support the video tag.