My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01945 (3)
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ01945 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2011 10:09:39 AM
Creation date
2/26/2008 9:38:28 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150193
Contractor Name
Dolores Water Conservancy District
Contract Type
Loan
Water District
34
County
Montezuma
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />CHAPTER XI - DESCRIPTION OF SELECTED PLAN <br /> <br />The development of WETP ACK will be pursued using two CWCB loan contracts. The original <br />Contract No. C150058 (Contract #1), provided for the purchase of 1,500 MVIC Class B Shares <br />with an associated annual water supply of 6,000 acre-feet. Contract #1 also included the <br />construction of facilities to irrigate approximately 440 acres in the Sandstone West area using <br />approximately 880 acre-feet. Though no cost was involved in constructing the facilities, 252 <br />acres of land are being irrigated using approximately 500 acre-feet from the MVIC Class B <br />Shares. There is approximately 4,620 acre-feet of MVIC Class B Share water available to <br />irrigate additiona11ands for the selected plan. <br /> <br />The DISTRICT is requesting a second loan (Contract #2) to allow construction of facilities to <br />irrigate approximately 2,200 acres in two areas designated as Yellow Jacket East (1 ,011 acres) <br />and Pleasant View East (1,189 acres). The facilities and estimated cost are described in this <br />chapter. <br /> <br />The process and alternatives considered to determine the facilities in the Selected Plan for <br />Contract #2 is described in the October 2000 Feasibility Study. Only a description of the <br />Selected Plan for Contract #2 is described herein. <br /> <br />XL1 GENERAL DESCRIPTION OF SELECTED PLAN <br />The Selected Plan will utilize approximately 4,400 acre-feet of water available from the 1,500 <br />MVIC Class B Shares to irrigate approximately 2,200 acres of land in the Yellow Jacket East <br />and Pleasant View East areas. <br /> <br />The Selected Plan consists of the construction of two sets of facilities. One set for the Yellow <br />Jacket East area to irrigate 1,011 acres and another set of facilities to irrigate 1,189 acres in the <br />Pleasant View East area. The new land will be served in the same manner as existing Project <br />irrigated land with delivery boxes for each 160 acres (or less) providing at least 45 psi of <br />pressure and 5.6 gpm per acre at the high point of the field to operate sprinkler systems. <br /> <br />XL2 FACILITY MAP <br />A map showing the facilities to be included in Contract #2 is shown on Figure XI-A. <br /> <br />XL3 DESIGNS AND DRAWINGS OF MAJOR STRUCTURES <br />The design criteria for the major structures are described below. The construction designs will <br />be prepared by DISTRICT engineering staff using standard facility drawings produced for <br />existing facilities. <br /> <br />The major structures for each irrigated block are described below. <br /> <br />Yellow Jacket East - A new pump station along the Dove Creek Canal, approximately <br />10,560 feet of pipe ranging in size from 10 inches to 16 inches, and 9 delivery boxes. <br /> <br />Pleasant View East - A new pump station along the Dove Creek Canal, approximately <br />15,840 feet of pipe ranging in size from 10 inches to 24 inches, and 12 delivery boxes. <br /> <br />14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.