My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01944 (2)
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
PROJ01944 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2011 10:09:39 AM
Creation date
2/26/2008 9:32:23 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150193
Contractor Name
Dolores Water Conservancy District
Contract Type
Loan
Water District
34
County
Montezuma
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />'\ r <br /> <br />Water Project Construction Loan Program - Project Data Sheet <br /> <br />Borrower: Dolores Water Conservancy <br />District - Water Activity Enterprise <br />Project Name: WETPACK II <br /> <br />County: Montezuma <br /> <br />Project Type: Pressurized Irrigation <br /> <br />Drainage Basin: Dolores <br /> <br />Water Source: Montezuma Valley Irrigation , <br />Irrigation Company (MVIC) <br />Funding Sources: CWCB, DWCD <br /> <br />Total Project Cost: $3,692,000 <br /> <br />Type of Borrower: Agricultural <br /> <br />Aver. Delivery: 4400 AF <br /> <br />CWCB STTFPBA Loan: $3,323,180 <br /> <br />Interest Rate: 2.50% <br /> <br />Term: 30 years <br /> <br />DWCD is applying for a loan to construct pumping plant and pipeline facilities to provide water to <br />irrigate existing dry land, as part of WETPACK (Water for Everyone Tomorrow Package.) The new <br />loan would replace the remaining unused amount ($2,931,200) on an existing $5,461,200 (3.5%, 30- <br />year) loan contract approved in 2002. DWCD has incurred cost increases due to drought-related <br />delays. To date, 1500 MVIC Class B Shares providing 6,000 AF/year have been acquired, and <br />construction on the 440-acre Sandstone West irrigation project is in process. The proposed project <br />would irrigate approximately 2,200 acres in the YI~lIow Jacket East (1,011 ac.) and Pleasant View East <br />(1,189 ac.) areas, using approximately 4,400 acre-feet of the MVIC Class B shares. Construction at <br />this level would provide irrigation to a total of 2892 acres and utilize 5,780 AF of water per year. <br />Construction will involve pipelines, pumps and related facilities to deliver water, through the Dove <br />Creek Canal System, under pressure for sprinkler irrigation only. The project will provide the irrigated <br />land with delivery boxes for each 160 acres (or less) providing at least 45 psi of pressure to operate <br />sprinkler systems. In the Yellow Jacket East area, facilities will include a new pump station along the <br />Dove Creek Canal, approximately 10,560 feet of pipe ranging in size from 10 inches to 16 inches, and <br />9 delivery boxes; and in the Pleasant View East area, will consist of a new pump station, approximately <br />15,840 feet of pipe ranging in size from 10 inches to 24 inches, and 12 delivery boxes. <br /> <br /> <br />.> <br /> <br />~ <br />16 ,,'0, )~_ <br /> <br />. .l:izard '~ <br />. '" .,'\, Head .~ <br />Pass / <br />10,222 ; <br /> <br />'-: <br /> <br /><\., <br /> <br />! <br />( <br />; <br />f' <br /> <br />t <br /> <br />.-. <br />- <br /> <br />,'l. <br /> <br />l <br /> <br />.-' <br />,p' ""- <br /> <br />Rock\l\Ood <br /> <br />, <br />~../, <br />! <br /> <br />Hermosa <br /> <br />I..."..... <br />. <br /> <br />J <br /> <br />~ <br /> <br />To.....oc <br /> <br />Location Map <br />
The URL can be used to link to this page
Your browser does not support the video tag.