My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01942 (3)
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
PROJ01942 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:25:16 AM
Creation date
2/26/2008 9:28:01 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153723
Contractor Name
Orchard Mesa Irrigation District
Contract Type
Loan
Water District
72
County
Mesa
Bill Number
HB 95-1155
Loan Projects - Doc Type
Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />;: <br />. <br /> <br />" <br /> <br />CWCB Construction Fund Loan Application <br />Revised January 31, 1994 <br /> <br />4. Is the organization incorporated in the State of Colorado? YES _ NO--1L- <br />(If "YES", please include a copy of the articles of incorporation, and the Bylaws with <br />this application form.) <br /> <br />5. Please provide a brief description of the owner's existing water supply facilities and <br />describe any existing operational or maintenance problems. (Attach separate sheets and <br />a map, if needed.): <br /> <br />OMID operates 40 miles of canals, 4 hydro pumps, 4 miles of power canal, <br /> <br />3 supplemental electric pump stations. We supply 27% of maintenance cost <br /> <br />for river diversion dam and 5 miles of delivery canal operated by Grand <br />Valley Water Users Association. <br /> <br />6, <br /> <br />For existing facilities indicate: <br /> <br />(a) the number of shareholders , or <br />(b) the number of customers served () I 000 . <br /> <br />Part B. - Description of the Project <br /> <br />1. Name of the project or facility: Mutual Mesa Lateral <br /> <br />2. What is the purpose of this loan application? Check one. <br /> <br />__ New project <br />-.X_ Rehabilitation or replacement of existing facility <br />_ Enlargement of existing facility <br />_ Emergency Repair <br />_ Other (describe) <br /> <br />3. If the project is for rehabilitation of an existing reservoir, is the reservoir currently under <br />a storage restriction order from the State Engineer? YES NO <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.