My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150161 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150161 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2011 10:01:23 AM
Creation date
2/26/2008 9:27:36 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150161
Contractor Name
Greeley and Loveland Irrigation Company
Contract Type
Loan
Water District
4
County
Larimer
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Mr. Edward A. Toms, P.E. <br />November 6, 2003 <br /> <br />Page 2 <br /> <br />The Greeley and Loveland Irrigation Company is reminded that, as the owner of this facility, <br />they are liable for the safety of the structure and for any loss of life and/or damages caused by a failure <br />of the dam or appurtenant structures. Acceptance of the Site-Specific PMP study does not relieve the <br />owner from this liability or from any other statutory obligations. Therefore, it is in the owner's best <br />interest to operate and maintain the facility in a manner such that the safety of the dam and the general <br />public are not jeopardized. <br /> <br />We appreciate the efforts of the Greeley and Loveland Irrigation Company in undertaking this <br />project and providing a safe facility for the storage of water. If you have any questions concerning the <br />acceptance of this study or any dam safety related issues, please do not hesitate to contact Mark <br />Haynes in our Denver office at (303) 866-3581 ext.8276. We look forward to working with you and your <br />staff on this project and to achieving a successful completion of the proposed spillway enlargement <br />projects in an effort to enhance the safety of these dams. <br /> <br />Sincerely, <br /> <br />~ZhV3p- <br /> <br />~ICk G. Byers, P.E. <br />Deputy State Engineer <br /> <br />xc: Jim Hall, Division Engineer <br />Jim. Dubiel', Dam Safety Field Engineer <br />Mark Haynes, Design Review Enginel3r <br />Bruce Johnson, Colorado Water Conservation Board <br />Ronald Brinkman, The Greeley & Loveland Irrigation Co., Owner Representative <br />George Taylor, Oregon State Climatologist <br /> <br />JGB/DB/MRH/gld:c:word/damsafety/Boyd Lake and Horseshoe Lake Dam 11-03.doc <br /> <br />/ <br />
The URL can be used to link to this page
Your browser does not support the video tag.