Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />SUMMARY OF PROPOSED PROJECT <br />EQUALIZER DAM REHABILITATION <br /> <br />Proiect Sponsor: Greeley and Loveland Irrigation Company <br /> <br />Type of Proiect: Agricultural and municipal- dam, spillway, and gate structure <br />improvements <br /> <br />Location: About two miles east of Loveland in Larimer County as shown on the <br />attached map - main irrigation service area is in Weld County <br /> <br />Date of Application: January 10, 1997 <br /> <br />Feasibility Study: Prepared by ECI, November 1997 <br /> <br />Project Description: The project involves replacing an existing gate structure on <br />Equalizer Dam with a new structure which will incorporate both the outlet gates and a <br />spillway. In addition, the existing dam embankment will be raised one foot. The spillway <br />will be designed to pass 75 percent of the Probable Maximum Precipitation f100d (a <br />Class I structure) in view of new urban development below the dam. <br /> <br />Estimated Project Cost: $426,000 <br /> <br />ReQuested Loan: $307,400 (80 percent of total project costs) <br /> <br />Existing Equalizer Dam Outlet <br /> <br /> <br />-- <br />