My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150036 Application
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150036 Application
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2014 2:47:49 PM
Creation date
2/26/2008 9:22:18 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150036
Contractor Name
Weld County Tri-Area Sanitation District
Contract Type
Loan
Water District
2
County
Weld
Bill Number
HB 00-1419
Loan Projects - Doc Type
Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />.!~ eWCR Construction Fund Loan Application <br /> <br />Fonn ReviHd ~ 4, ~ <br /> <br />8. <br /> <br />List any feasibility studies or other investigations rhat have been completed or are now in <br /> <br />progress for the proposed project. (please submit one copy of each completed study with <br /> <br />this application): <br /> <br />Re ort of Investigation for the Tri-Area Drainageway Improvements, Town of <br />Firestone by.TST, Inc. Dated Norm er <br /> <br />9. <br /> <br />RMC Study- Master Drainage Study for the Tri-Area Basin, September 1984 <br />KM.C ~tud.y Ihe l'reder1.ck, J!VCillt;l..UI1 & F.i.l.t:::>Luu<::: U':L.vt St.6t.fl D)I~tCHl Improvements <br />Gingery Study Hydrology 1977 for the Tri-Area Basin May 1985 <br />. RMC - South Side Drainage Improvements - April 1996 <br />\Vhat is the estimated cost of the project? Please incLude estimated Engineering costs. and <br /> <br />estimated CODSttUction costs, if known: <br /> <br />Esrim:lted Engineering Costs: <br />Estimated Construction COStS: <br />Estimated Total Costs: <br /> <br />S 314.244 <br />$2.094.960 <br />$2,409,204 <br /> <br />10. <br /> <br />What loan amount and terms are you requesting? <br />completing this section): <br />Requested Loan Amount: <br />Term (length) of loan: <br />Interest Rate: <br /> <br />(please call for our current rates before <br /> <br />$1.000.000 <br />30 . <br /> <br />(Usually 75" of ~ TllCII Cosc:s) <br /> <br />3-1/2 <br /> <br />years <br />% <br /> <br />.> (Usually to. 20, Ot 30 yean) <br /> <br />Part C. - Project Sponsor Financial Information <br /> <br />-- <br />Because the CWCB Construction Fund is a revolving fund, it is imp<)rtant that the project <br />sponsor have the finaJJcial capacity to repay any loam made by the CWCB. The following <br />information is requested to assist the CWCB in a preliminary assessment of the applicant's <br />fmancial capacity. It is also requested that the project sponsor submit wirh this application copies <br />of the two most recent annual reports, fiDancial statements, corporate reports or other c~nt <br />documentation of financial condition and operations. <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.