My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150036 Application
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150036 Application
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2014 2:47:49 PM
Creation date
2/26/2008 9:22:18 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150036
Contractor Name
Weld County Tri-Area Sanitation District
Contract Type
Loan
Water District
2
County
Weld
Bill Number
HB 00-1419
Loan Projects - Doc Type
Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.- <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />~ <br />CWCB Construction Fund Loan Application <br /> <br />Form RcYbed ~ 4, 1998 <br /> <br />Is the organization incorporated in the State of Colorado? YES NO x <br /> <br />(If "YES", please include a copy of the articles of incorporation, and the Bylaws with <br /> <br />this application form.) <br /> <br />Special District formed 1955 (Civil Action case #55CV13027)Weld County <br /> <br />5. Please provide a brief description of the o~r' s existing water supply facilities and <br /> <br />describe any existing operational or maintenance problems. (Attach separate sheets and a <br /> <br />map, if needed.): Under Colorado State Statutes, Weld County Tri-Area Sanitation <br />-District c~n expand its services to include storm drainage. A storm drainage <br />proJect: was Jo~nt:J.Y ~n~t:~at:eC1 by the l.Own~ uf lr:ederldt and rlr:e~L.une ""as turned <br />over to the District late in 1983. Construction began during 1986.. $315,375.79 <br />was collected .in 1987; $20,000 of which was the District funds. From 1984 <br />tbrQwgk 19Q7 $4Qi,OOl.14 U28 8p9Rt on a portion of the proposed drainage project. <br />There was.~ot enough money to complete all phases of the project. <br /> <br />4. <br /> <br />6. <br /> <br />For existing facilities indicate: <br />(a) Number of shareholders or <br />(c) Cunent Assessment per share S_ <br />(e) Number of acres irrigated <br /> <br />Ilof taps <br />Cb> Number of customers served~ from our District <br />1027 from Dacono San DiE <br /> <br />Cd) Number of shares <br /> <br />Part B. - Description .of the Project <br /> <br />1. Name of the project or facility: Weld Countv Tri-Area C_onveyance- Improvements <br /> <br />2. What is the purpose of this loan_applica_~on? C.'beck one. <br />_ New project <br />_ Rehabilitation or replacement of existing faciliry <br />_ Enlargement of existing facility <br />_ Emergency Repair <br /> <br />-LOther(describe) R~~ici~n('PC: lip tJithin flood plA.in~ which experience various ..forms <br />of damage due to flood waters from drainage ditches. <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.