My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01937 (2)
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ01937 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2011 9:57:29 AM
Creation date
2/26/2008 9:20:35 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150210
Contractor Name
Little Thompson Water District
Contract Type
Loan
Water District
4
County
Larimer
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
139
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Chapter VI - Cost Estimate <br /> <br />Item No. Item Description Quantity Unit Unit Price Total Cost <br />60 Pump Station Piping 1 Lump Sum $100,000 $100,000 <br />61 General Valves 1 Lump Sum $285,000 $285,000 <br />62 Miscellaneous Mechanical 1 Lump Sum $45,000 $45,000 <br />63 Sewage System Improvements 1 Lump Sum $5,000 $5,000 <br />64 Pump Station Start-up and Testing 1 Lump Sum $25,000 $25,000 <br /> PIPELINES <br />65 24-Inch Diameter Class 300 DIP 2,900 Linear Feet $104.00 $301,600 <br />66 24-Inch Diameter Class 250 DIP 3,624 Linear Feet $102.00 $369,648 <br />67 24-Inch Diameter Class 200 DIP 1,055 Linear Feet $100.00 $105,500 <br />68 24-Inch Diameter Steel Pipe 369 Linear Feet $215.00 $79,335 <br />69 AirN ac Vaults 2 Each $10,000 $20,000 <br />70 Meter Vault 1 Lump Sum $77 ,000 $77 ,000 <br />71 Overexcavation to Remove Unsuitable Material <br /> in Pipe Trench Foundation 60 Cubic Yards $50.00 $3,000 <br />72 Additional Rock Refill for Pipe Trench <br /> Foundation Stabilization: <br /> a. Depth of 0- to 12-Inches 10 Cubic Yards $30.00 $30C <br /> b. Depth of 12- to 24-Inches 20 Cubic Yards $40.00 $80C <br /> c. Depth over 24-Inches 30 Cubic Yards $70.00 $2,1 OC <br />73 Blow-Off 1 Each $4,000 $4,00C <br />74 Imported Pipeline Backfill Material 420 Cubic Yard $30.00 $12,60C <br /> ELECTRICAL SYSTEMS <br />75 Electrical Systems 1 Lump Sum $400,000 $400,00C <br /> INSTRUMENTATION AND CONTROL SYSTEMS <br />76 Instrumentation and Control Systems 1 Lump Sum $130,000 $130,000 <br /> TOTAL ESTIMATED CONSTRUCTION COST $ 14,440,00C <br /> <br />Table VI-2: Probable Project Costs <br /> <br />Description <br />Construction Management Services <br />Land Acquisition <br />Legal Fees <br />Construction (details provided in Table VI-I) <br />Total Project Costs <br /> <br />Estimated Cost <br />$430,000 <br /> <br />$6,670,000 <br /> <br />$60,000 <br /> <br />$14,440,000 <br /> <br />$21,600,000 <br /> <br />Dry Creek Reservoir Project <br /> <br />21 <br /> <br />saVLE <br />
The URL can be used to link to this page
Your browser does not support the video tag.