My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01937 (2)
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ01937 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2011 9:57:29 AM
Creation date
2/26/2008 9:20:35 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150210
Contractor Name
Little Thompson Water District
Contract Type
Loan
Water District
4
County
Larimer
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
139
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Chapter 11.- Project Description <br />Pipeline <br /> <br />Most of the pipe will be ductile iron pipe with cement mortar lining and polyethylene bag <br />wrapping, however the pipe between the pump station and the dam outlet as well as the piping <br />within the building will be steel with cement mortar lining. A tracer wire will be installed along <br />the pipeline for future locating. <br /> <br />Pump Station <br /> <br />The pump station was increased to 6,300 gpm (9 MOD) from the original 5,000 gpm (7 <br />MOD) to provide more flexibility to the Districts. Three 3 MOD vertical turbine pumps will be <br />installed to deliver this flow rate. A VFD allowing flow ranges from 1.5 MOD up to 9 MOD <br />controls two of the pumps. The required pump head is approximately 600 feet, resulting pump <br />motor sizes of 400 HP for each of the pumps. A fourth bay will be provided to allow the Districts to <br />increase the maximum flow to 8,400 gpm (12 MOD) in the future. <br />The pump station architecture will consist of split faced block walls and a metal standing <br />seam roof. The building will contain a basement to access the pump cans and house the surge <br />protection system. The building dimensions will be approximately 63 feet by 38 feet. <br /> <br />Dry Creek Reservoir Project <br /> <br />8 <br /> <br />ElCJ'VLE <br />
The URL can be used to link to this page
Your browser does not support the video tag.