Laserfiche WebLink
<br />Chapter 11-- Project Description <br /> <br />Chapter II - Project Description <br /> <br />The proposed reservoir will be located at the same location as the original reservoir. The <br />differences between the projects are related to the size of the facilities. The table below compares <br />the project differences between the studies for the pump station, dam, spillway, and outlet works. <br />Figure IT-I shows a general plan of the proposed project. <br /> <br />Table II-I: Comparison of Characteristics <br /> <br />Item Original Configuration Proposed Configuration <br />Pump Station 5,000 gpm 6,300 gpm with option to expand <br /> to 8,400 gpm <br />Dam Type Earthfill dam with cutoff trench; Earthfill dam with cutoff trench; <br /> blanket and toe drains; and chimney, blanket, and toe drains; <br /> riprap protection on upstream and riprap protection on <br /> face upstream face <br />Dam Height 42 feet 55 feet <br />Dam Crest Length 2,610 feet 4,820 feet <br />Normal Stora~e Volume 5,200 acre-feet 8,850 acre-feet <br />Normal Surface Area 230 acres 299 acres <br />Crest Width 25 feet 25 feet <br />Upstream Slope 4H:IV 3H:IV <br />Downstream Slope 3H:1V 2.5H: I V <br />Dam Crest Elevation 5200 feet 5225 feet <br />Spillway Type Broad Crested Weir at Right RCC Section with Labyrinth <br /> Abutment Weir near maximum section <br />Spillway Crest Elevation 5195 feet 5220 feet <br />Spillway Width 350 feet 41 feet <br />Embankment Volume 285,000 cubic yards 890,000 cubic yards <br />Outlet Diameter 48 inches 36 inches <br />Outlet Length 325 feet 320 feet <br /> <br />The site description and geologic evaluation are generally consistent between the original <br />study and this study. The geotechnical evaluation, hydrologic evaluation, outlet works, and raw <br />water transmission systems vary considerably and are described in the following paragraphs. <br /> <br />A. Geotechnical Evaluation <br />The dam will be a homogeneous earthfill dam with chimney, blanket, and toe drains; riprap <br /> <br />Dry Creek Reservoir Project <br /> <br />5 <br /> <br />ElCJlfrlLE <br />